Installation
instructions
3.3
Heater
placement
and clearances
The
AQ125
BO
is design
certified
for
installation
directly
on a combustible
wall.
(see 3.4
Mounting
installation).
For installation
on vinyl siding see Fig. 7.
Keep the area below
the heater free of combustible
material.
Minimum
clearances
If the appliance
is installed
under an overhang,
there
must be a 36" clearance
from the top of the appliance
and the mounting
area must be open in front and on the
sides of the appliance.
Fig. 5
AQ125BO_6
ill
i !iiii
i ¸ _ _ _
_i _
__;_
_ ¸
;i;
A
Directly below or from an
B
opening;
operable
windows,
> 4 ft
doors and any fresh air
C
openings
D
From any adjacent
wall or tall
> 4 ft
shruberry
E
Below a gutter, sanitary
> 3 ft
pipework,
eaves or overhang
F
Above ground
> 1 ft
From a gas meter, gas
G
regulator,
electrical
box or
> 3 ft
another
125 BO heater.
Table 2 Clearances
3.4
Mounting
installation
Front cover should be removed in order to
inspect
components
visually
(see
instructions
below).
To remove front cover.
Loosen the two screws
located on the sides of the
front panel, see Fig. 6.
Fig. 6
Remove front cover
Ensure
that
the
flue
terminal
is clear
of
combustible
material.
• After inspection,
replace front cover and tighten
screws.
any
• Install only on an external wall, as close as possible
to the most frequently
used hot tap (note clearances
in chapter 3.3).
• If the unit is to be installed on a combustible
surface
use the enclosed
heat shield (see Fig. 5).
8
8 716 473 147

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aq 125 bo ngAq 125 bo lpAquastar 125bo lpAquastar 125bo ngAq 125bo ng

Table of Contents