Pneumatic Connection - Duerkopp Adler 506 Installation Instructions Manual

Table of Contents

Advertisement

4. Pneumatic Connection

1
2
3
For the operation of the clamp lifting, thread tension opening, needle
cooling, etc. the unit must be supplied with water-free, lightly oiled
compressed air.
ATTENTION !
For a flawless functioning of the pneumatic control processes the
compressed air supply must be laid out as follows:
Even at the instant of greatest air consumption the minimum operating
pressure may not fall below 5 bar.
Connecting the compressed air maintenance unit
Connect the connection hose 3 for the maintenance unit to the
compressed air supply with the enclosed coupling.
Filling the oil reservoir of the oil mister
For filling the oil reservoir use only ESSO SP-NK 10 lubricating oil.
SP-NK 10 can be obtained from DÜRKOPP ADLER AG sales offices.
Shut the compressed air off completely by turning the knob 1
counterclockwise.
Screw out the oil filler screw 4.
Fill the oil reservoir 5 up to the groove marking with
ESSO SP-NK 10 lubricating oil.
After filling the oil release the compressed air again by pulling up
on and turning the knob 1 clockwise.
Setting the operating pressure
The operating pressure is 6 bar.
It can be seen on the pressure gauge 2.
For setting the operating pressure pull knob 1 up and turn.
Turning clockwise
Turning counterclockwise
= Increase pressure
= Decrease pressure
4
5
9

Advertisement

Table of Contents
loading

Table of Contents