Download Print this page

HP Model 748 - VME Workstation Installation Manual page 7

Mass storage module upgrade kit
Hide thumbs Also See for Model 748 - VME Workstation:

Advertisement

Installing Devices in the New Mass Storage Module
Follow these steps to install the mass storage devices in the new mass storage module. Figure 4 shows
the cabling scheme for the new mass storage module.
1.
Remove the mass storage devices from the old mass storage module.
2.
Install the mass storage devices into the new mass storage module. Refer to the Mass Storage
Module Configuration Guidelines for the configurations of mass storage devices allowed.
SE SCSI Cable
From SE SCSI Adapter
To External SE SCSI Devices
CAUTION: The new mass storage module has a power cable, single–ended SCSI
FW SCSI Cable
Figure 4 Mass Storage Module Cabling
cable and a fast wide SCSI cable. Be sure that the cables are secured to
their connectors on the drives and not pinched or pulled too tight before
installing the mass storage module back into the chassis.
From FW SCSI Adapter
To External FW SCSI Devices
7
DC Power Cable

Advertisement

loading

This manual is also suitable for:

A4350a