Preparing For Management - 3Com 3CR17251-91 - Switch 5500G-EI Stackable Gigabit Ethernet Getting Started Manual

Superstack 4 5500 series switch
Hide thumbs Also See for 3CR17251-91 - Switch 5500G-EI Stackable Gigabit Ethernet:
Table of Contents

Advertisement

54
C
3: S
HAPTER
ETTING
Preparing for
Management
U
M
P FOR
ANAGEMENT
be allocated to the Switch. Refer to the documentation that accompanies
your DHCP/BootP server.
For a detailed description of how automatic IP configuration operates,
please refer to the Configuration Guide on the CD-ROM that
accompanies your Switch or the 3Com Web Site.
You should use the automatic IP configuration method if:
your network uses DHCP or BootP to allocate IP information, or
flexibility is needed. If the Switch is deployed onto a different subnet,
it will automatically reconfigure itself with an appropriate IP address,
instead of you having to manually reconfigure the Switch.
If you use the automatic IP configuration method, you need to discover
the automatically allocated IP information before you can begin
management. Work through the
Information"
section on
Once your Switch's initial set up is complete you can set up your chosen
management method as described in
on
page
50.
For detailed information about the specific web interface operations and
command line interface commands and problem solving, refer to the
"SuperStack 4 Switch 5500 Command Reference Guide" on the CD-ROM
that is supplied with the Switch or on the 3Com Web site.
"Viewing Automatically Configured IP
page
61.
"Methods of Managing a Switch"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents