Step 9. Final Installation Checklist - Samsung FX510BGS/XAA Installation Manual

Free-standing gas range
Hide thumbs Also See for FX510BGS/XAA:
Table of Contents

Advertisement

Step 9. Final installation checklist

You have just completed installing your range. Make sure all controls are in the off
position and the flow of ventilation air to the range is unobstructed. The following
is a checklist to confirm your range is safely installed and ready for operation.
-
Gas line has been properly connected to the range.
The gas has been turned on. All connections have been
checked for leaks.
-
Range is plugged into the properly grounded electrical
receptacle.
-
Approved anti-tip bracket is properly installed and engaged with the range.
-
Range is leveled and is firmly sitting on a solid,
level floor.
-
Gas surface burners have been properly
assembled.
-
All burners have been tested for proper
operation.
-
FOR INSTALLER ONLY—Check and/or adjust
the broil and oven burner flames as described on
page 37 in this manual.
36_ installation instructions
(Install)FX710BGS_FX510BGS_DG68-00357A-01_EN_120706.indd 36
Gas Range
Plug
Locking screw
2012-07-09
4:45:55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents