Step 9. Final Installation Checklist - Samsung NX58M5600S Series Installation Manual

Free-standing gas range
Table of Contents

Advertisement

Available languages

Available languages

Step 9. Final installation checklist

You have just completed installing your range. Make sure all controls are in the off
position and the flow of ventilation air to the range is unobstructed. The following
is a checklist to confirm your range is safely installed and ready for operation.
-
Gas line has been properly connected to the range.
The gas has been turned on. All connections have been
checked for leaks.
-
Range is plugged into the properly grounded electrical
receptacle.
-
Approved anti-tip bracket is properly installed and engaged with the range.
-
Range is leveled and is firmly sitting on a solid,
level floor.
-
Gas surface burners have been properly
assembled.
-
All burners have been tested for proper
operation.
-
FOR INSTALLER ONLY—Check and/or adjust
the broil and oven burner flames as described on
page 37 in this manual.
Locking screw
installation instructions _37
Gas Range
Plug

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nx58h5600s seriesNx58j5600s seriesNx58h5650w series

Table of Contents