Index - HP Rp3440-4 - 9000 - 0 MB RAM Manual

Generic site preparation guide
Hide thumbs Also See for Rp3440-4 - 9000 - 0 MB RAM:
Table of Contents

Advertisement

Index

A
acoustics, 23
air-conditioning
ducts, 21
requirements, 20
system recommendations, 20
air-distribution system
room space return air, 21
airflow, 16
B
basic air-distribution systems, 21
C
cell phone use, 17
circuit breaker size, 11
computer room preparation, 17
computer room safety
fire protection, 9
computer system
environmental elements, 17
power system protection, 11
sample installation schedule, 30
contamination dust
metallic particulates, 18
conversion formulas, 29
cooling requirements, 20
D
data communications cables, 15
dust and pollution control, 18
E
electrical and environmental guidelines
air-distribution system, 21
circuit breaker size, 11
computer equipment grounds, 13
computer room safety
fire protection, 9
fire suppression, 10
dust and pollution control, 18
electrical conduit ground, 13
grounding systems, 12
lighting requirements, 10
main building electrical ground, 12, 13
power distribution safety grounding, 12
power panel grounds, 13
power quality, 11
sources of electrical disturbances, 11
system installation guidelines, 15
electrical load requirements, 11
environmental elements, 17
acoustics, 23
air-conditioning equipment requirements, 20
air-conditioning recommendations, 20
air-distribution systems, 21
computer room considerations, 17
cooling requirements, 20
dust and pollution control, 18
electrostatic discharge
prevention, 22
humidity level, 22
static protection measures, 22
equipment
grounding, 14
orientation, 16
ESD prevention, 17
example installation schedule, 30
F
facility characteristics, 23
facility guidelines
characteristics, 23
floor-loading terms, 23
floor-plan grid, 26
operational space requirements, 25
typical raised floor site, 24
windows, 25
fire protection, 9
fire suppression, 10
floor loading
raised floor, 24
terms, 23
floor plan grid, 26
G
grounding systems, 12
electrical conduit ground, 13
H
humidity level, 22
I
installation schedule, 30
L
lighting requirements, 11
M
main building electrical ground, 12
metallic particulate contamination, 19
P
pollution control, 18
power distribution
hardware, 12
safety grounding, 12
power plug configuration, 26
power quality, 11
power system protection, 11
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rp7410Rx2620-2 - integrityL1000 - 9000

Table of Contents