Filtration Drain Connection - GE PNRQ21RBN Owners And Installation Manual

Ge profile reverse osmosis filtration system with brushed nickel faucet
Table of Contents

Advertisement

Available languages

Available languages

FILTRATION DRAIN CONNECTION

Check and comply with local plumbing codes as you plan.
CAUTION:
Do not use any drain saddle device.
NOTE: Failure to follow these Installation Instructions will void the warranty, and the installer
will be responsible for any service, repair or damages caused thereby.
PREFERRED INSTALLATION:
BASEMENT ACCESS INSTALLATION
Route the drain line DIRECTLY from the Reverse
Osmosis system to a standpipe in the basement,
bypassing the air gap provided in the faucet. The
air gap installation is left to the discretion of the
installer. The drain line may also be routed to a
floor drain or washtub, provided that the air gap is
maintained. Special air gap fittings are available to
connect the drain line to the top of the standpipe.
Drain line from the Reverse Osmosis system
Installation Instructions
1"
1" minimum air gap
must be maintained
PREFERRED INSTALLATION:
P-TRAP INSTALLATION
Install a separate dry-vented p-trap under the sink
to be used exclusively for the Reserve Osmosis
drain line. A dry-vented p-trap is a p-trap that has
its own vent/stack. Attach the drain line adapter to
the p-trap and secure it with the slip joint nut and
through the air gap provided in the RO water faucet.
Reverse
Osmosis
drain line
16
Optional disposer

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pnrq20rblPnrq21rrb

Table of Contents