FIGURE
Section 1 GENERAL DESCRIPTION............................................................. 1-1
Section 2 INSTALLATION OVERVIEW....................................................... 2-1
Section 3 INSTALLATION PROCEDURE .................................................... 3-1
Section 4 SYSTEM INTERCONNECTS......................................................... 4-1
J2301 Connector..................................................................................................................... 4-1
Appendix A Construction and Validation of Structures............................... A-1
Upward static Load Test ....................................................................................................... A-2
Forward Static Load Test ...................................................................................................... A-2
Appendix B Shield Block Installation Instructions ........................................B-1
Method A.1 for Shield Termination...................................................................................... B-3
Method A.2 (Daisy Chain) for Shield Termination .............................................................. B-7
Method B.2 (Daisy Chain-Quick Term) for Shield Termination.......................................... B-9
Daisy Chain between Methods A and B ............................................................................. B-10
Appendix C External Interface Drawings (Example Only).......................... C-1
Appendix D Assembly and Installation Drawings......................................... D-1
Page iv
Revision A
LIST OF FIGURES
PAGE
GTX 23 Installation Manual
190-00906-01