Removing And Installing Cables Into Sfp Transceivers - Cisco MDS9120 - MDS 9120 Multilayer Fabric Switch Installation Manual

Hardware installation guide
Hide thumbs Also See for MDS9120 - MDS 9120 Multilayer Fabric Switch:
Table of Contents

Advertisement

Chapter 3
Connecting the Cisco MDS 9100 Series
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m
Figure 3-4
Figure 3-5
Step 4
Insert a dust cover into the port end of the transceiver and place the transceiver on an antistatic mat or
into a static shielding bag if you plan to return it to the factory.
Protect the optical cage by inserting a clean cover if another transceiver is not being installed.
Step 5

Removing and Installing Cables into SFP Transceivers

To prevent damage to the fiber-optic cables, do not place more tension on them than the rated limit and
Caution
do not bend to a radius of less than one inch if there is no tension in the cable, or two inches if there is
tension in the cable.
OL-21514-01
Alternate Removal Method for Bale Clasp SFP Transceivers in the Cisco MDS 9124
Switch
Alternate Removal Method for Bale Clasp SFP Transceivers in the Cisco MDS 9140
Switch and the Cisco MDS 9120 Switch
Connecting to a Fibre Channel Port
Cisco MDS 9100 Series Hardware Installation Guide
3-7

Advertisement

Table of Contents
loading

Table of Contents