EPSON Stylus COLOR 680/777/777i
Head installing position pins
Printhead installing the position pin & the grounding plate.
n
Tightening Torque for screw
• C.B.P-TITE 3x6 screw for printhead: 6+/1kgf.cm
When the Printhead is replaced with a new one, following
adjustments must be performed in the order below:
1.
Initial ink charge
2.
Printhead ID input
3.
Bi-d adjustment
When the Printhead is removed and reinstalled, only the following
adjustment is required.
1.
Head cleaning
2.
Bi-d adjustment
Disassembly and Assembly
Head grounding plate
Figure 4-9.
Disassembly
Revision B
70