Asus ESC4000 G2 User Manual page 26

2u rackmount server
Hide thumbs Also See for ESC4000 G2:
Table of Contents

Advertisement

2.
Press the left load lever with your
thumb (A), then move it to the left (B)
until it is released from the retention
tab.
To prevent damage to the socket
pins, do not remove the PnP cap
unless you are installing a CPU.
3.
Slightly lift the load lever in the
direction of the arrow.
4.
Press the right load lever with your
thumb (C), then move it to the right (D)
until it is released from the retention
tab. Lift the load lever in the direction
of the arrow (E).
2-4
A
B
Load lever
C
Chapter 2: Hardware setup
E
D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Esc4000/fdr g2

Table of Contents