Download Print this page

Installation; Site Preparation - Dell PowerConnect M8428-k Getting Started Manual

Dell m8024-k getting started guide
Hide thumbs Also See for PowerConnect M8428-k:

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Table 1-1 contains the status LED definitions:
Table 1-1. PowerConnect M8024-k Power and Status LED Definitions
LED
Color
Green
Off
Blue
Off
Amber

Installation

Site Preparation

Before installing the switch or switches, make sure that the chosen
installation location meets the following site requirements:
Clearance — There is adequate front and rear clearance for operator
access. Allow clearance for cabling, power connections, and ventilation.
Cabling — The cabling is routed to avoid sources of electrical noise such
as radio transmitters, broadcast amplifiers, power lines, and fluorescent
lighting fixtures.
Ambient Temperature — The ambient switch operating temperature
range is 10° to 35ºC (50° to 95ºF).
NOTE:
above 900 m (2955 ft.).
Relative Humidity — The operating relative humidity is 8% to 85%
(non-condensing) with a maximum humidity gradation of 10% per hour.
8
Getting Started Guide
Definition
Power is being supplied to the switch.
The switch does not have power.
The switch is operating normally.
The switch is powered off.
A fault has occurred, or the switch is currently booting.
Decrease the maximum temperature by 1°C (1.8°F) per 300 m (985 ft.)

Advertisement

loading

This manual is also suitable for:

Poweredge m915Powerconnect m8024-k