Dodge Sprinter 2500 Options Manual page 167

Special equipment book
Table of Contents

Advertisement

PRE-INSTALLATION,
AUXILIARY HEAT EXCHANGER
Details and Technology
Two water lines (supply line/return line) are routed under the floor panel on the left hand side of the
vehicle, extending aft of the B-pillar. The ends of the two lines are connected by a hose. Bodywork
modifications for installation of a heat exchanger, the aperture in the wood floor for the warm air ducting
and electrical parts are not included.
Benefits and Arguments
• Simplified fitting of auxiliary heat exchangers from the accessories range
The pre-installation package is recommended for body manufacturers who offer their own hot water
heating systems.
Remarks
Pre-installation auxiliary heat exchanger is not available with Left Side Sliding Door (GKE) or C-pillar
cargo partition (GEX). Requires either the Front Auxilliary Heater (HDB) or Heater Booster (3JV).
HEATING/COOLING
CODE XBJ
Pre-installation
for auxiliary heat
exchanger
165

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sprinter 3500

Table of Contents