Powering Up And Configuring The Server; Accessing The Processor Board And I/O Tray - Compaq ProLiant 2500 Installation Manual

Compaq proliant 2500 servers installation guide
Hide thumbs Also See for ProLiant 2500:
Table of Contents

Advertisement

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4-28
Overview of Installing ProLiant 2500R Server and Hardware Options
3.
4.
5.
6.
Before loading another component, be sure to secure the server to the rack
using the face plate thumb screws.
Powering Up and Configuring
the Server
After the cables have been connected, you are ready to power up the server.
Refer to Chapter 3, "Overview of Installing ProLiant 2500 Server and
Hardware Options," for the power-up and configuration procedures.
Accessing the Processor Board
and I/O Tray
To service your rack-mounted server, you need access to the processor board
and the I/O tray, as shown in the following sections.
If you install a switch box in the rack, route the CPU-to-switch-box
cables to the switch box.
Bundle all of the cables, including the power cable, and tie them to the
cable management arm.
If you are going to route cables to the other side of the rack, attach the
bundled cables to the cable support and join the other cables in the
opposite cable channel.
Extend the bundled cables down the rack's cable channel.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant 2500r

Table of Contents