The Gaseous Fuel System

The information below is provided to assist gaseous fuel
system technicians in planning installations. In no way
should this information be interpreted to conflict with
applicable fuel gas codes. Consult with your local fuel
supplier or Fire Marshall if questions or problems arise.
WARNING Propane and Natural Gas are extremely flammable
and explosive, which could cause burns, fire or
explosion resulting in death, serious injury and/or
property damage.
• LP gas is heavier than air and will settle in low areas.
• Natural gas is lighter than air and will collect in high areas.
• The slightest spark could ignite these fuels and cause an explosion.
• DO NOT light a cigarette or smoke.
TO THE INSTALLER: Consult with the generator owner(s) and
convey any technical considerations that might affect their
installation plans before applying these general guidelines.
The following general rules apply to gaseous fuel
system piping:
WARNING Propane and Natural Gas are extremely flammable
and explosive, which could cause burns, fire or
explosion resulting in death, serious injury and/or
property damage.
• Before placing the generator into service, the fuel system lines
must be properly purged and leak tested.
• No leakage is permitted.
NOTICE The supplied flexible steel fuel line is not to be installed
underground or in contact with the ground.
The entire flexible steel fuel line must be visible for
periodic inspection and must not be concealed within
nor contact nor run through any wall, floor, or partition.
• The piping should be of a material that conforms
to federal and local codes, rigidly mounted and
protected against vibration.
• Piping should be protected from physical damage
where it passes through flower beds, shrub beds, and
other cultivated areas where damage could occur.
18
• Install the
flexible steel fuel line
the generator fuel inlet port
to prevent thermal expansion or contraction from
causing excessive stress on the piping material.
E
F
C
• A union
or flanged connection shall be provided
downstream to permit removal of controls.
• A manometer port should be provided
manometer, P/N 19495, is available at your Briggs &
Stratton service center. When the initial test runs are
completed, the manometer is removed and the port
is plugged. The manometer port permits temporary
installation of a manometer to ensure that the
engine receives the correct fuel pressure to operate
efficiently throughout its operating range.
• Where the formation of hydrates or ice is known to
occur, piping should be protected against freezing. The
termination of hard piping should include a sediment
F
trap
where condensate is not likely to freeze.
• A minimum of one accessible, approved manual
E
shutoff valve
shall be installed in the fuel supply
line within 6 ft (180 cm) of the home generator.
• A minimum 10 ft. (3 m) section of gas pipe between
the primary fuel regulator and the generator fuel inlet
connection (acts as accumulator for high block loads).
• A manual fuel shut-off valve located in the interior of
the building.
• Where local conditions include earthquake,
tornado, unstable ground, or flood hazards, special
consideration shall be given to increase strength and
flexibility of piping supports and connections.
B
(supplied) between
A
and rigid piping
D
C
B
A
D
. A digital

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Home generator system 13000 watt11000

Table of Contents