Initial Start-up (No Load)

Unit has been set-up for NG operation at the factory. Fuel
conversion, if needed, must be completed prior to performing
these steps. See Fuel Conversion.
Before operating the home generator or placing it into
service, inspect the entire installation carefully. Then begin
testing the system without any electrical loads connected,
as follows:
1. Remove four screws
to enclosure to expose unit's circuit breaker.
A
A
2. Connect an accurate frequency meter to line side of
generator's main circuit breaker.
3. Set generator's main circuit breaker to ON
(closed) position.
4. Set generator's system switch to OFF.
CAUTION Installing the 15A fuse could cause the engine
to start at any time without warning resulting in minor or
moderate injury.
• Observe that the 15 Amp fuse has been removed from the control
panel for shipping.
• DO NOT install this fuse until all plumbing and wiring has been
completed and inspected.
5. Install 15 Amp fuse in control panel.
6. Set generator's system switch to AUTO.
7. Push and hold MANUAL OVER-RIDE button on control
panel for about six seconds. Engine will start.
A
that secure control box front
When the generator is started for the very first time, it will
require that air in the gaseous fuel lines be purged. This may
take a few minutes.
8. Listen for unusual noises, vibration or other
indications of abnormal operation. Check for oil leaks
while engine runs.
9. Let engine warm up for about five minutes to allow
internal temperatures to stabilize.
10. Check generator output at load side of circuit breaker.
Voltage should be 239 - 262 Volts, frequency should
A
be 62.0 - 62.5 Hz.
If either parameter is outside these ranges, perform Engine
Adjustment described later in this section.
11. Check generator output between one generator
connection lug and neutral lug, then between
other generator connection lug and neutral lug.
In both cases, voltage reading should be between
119 and 131 Volts.
A
DO NOT proceed until you are certain that generator AC
voltage and frequency are correct and within the stated
limits. To obtain the proper generator frequency, see
Engine Adjustment.
12. Push and hold MANUAL OVER-RIDE button on control
panel until engine stops.
13. Reinstall control panel into enclosure.