ROLEC SECURICHARGE Installation & Operation Manual

Intelligent ev charging unit

Advertisement

Quick Links

INSTALLATION & OPERATION MANUAL
SECURICHARGE
Designed &
Manufactured
Intelligent EV charging unit
in the UK

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SECURICHARGE and is the answer not in the manual?

Questions and answers

Summary of Contents for ROLEC SECURICHARGE

  • Page 1 INSTALLATION & OPERATION MANUAL SECURICHARGE Designed & Manufactured Intelligent EV charging unit in the UK...
  • Page 2: Product Support

    Date Published: June 2025 Rolec Services Ltd are the publishers of this document and own the rights to use the text, images and all technical content contained within. Content supplied by third parties / partner organisations remains the property of that organisation and is used by agreement with the supplier.
  • Page 3: Table Of Contents

    Chargepoint Commissioning Configuration Chargepoint Installation Completion Operation End a Charging Session About Charging Cables Maintenance Charge point Maintenance About Software Updates Suggested Inspection and Testing EVSM-V03-R0 Installation and Operation Manual SecuriCharge Intelligent EV Charging Unit Page 2 of 31 June 2025...
  • Page 4: Safety Information

    Safety Information Safety Information This manual applies specifically to the SecuriCharge Intelligent EV Charging Unit and is provided as a guide to its installation and operation. IMPORTANT: Installers and End Users must read and understand this manual before installing or using the product.
  • Page 5: Product Overview

    SecuriCharge Intelligent EV Charger + LCD screen & contactless payment terminal - 1x up to 7.4kW Type 2 Socket - Black ROLEC3111B SecuriCharge Intelligent EV Charger + LCD screen & contactless payment terminal - 1x up to 22kW 3PH Type 2 Sockett - Black ROLEC3113B SecuriCharge Intelligent EV Charger + LCD screen &...
  • Page 6: Product Features

    In remote areas, users may need to consider installing an external antenna or a Wi-Fi booster to maintain connectivity. For commercial installations, Rolec’s preferred partner is Monta. However, other supported platforms include Fuuse, Clenergy EV, Virta, and Ampeco. For domestic installations, Monta is again the preferred partner, providing free app connectivity and support.
  • Page 7: Load Management

    Product Overview Rolec Chargepoints are pre-configured with a 13A buffer. This means Load Balancing activates 13 amps below the property's main fuse limit, helping to maintain system stability and prevent nuisance tripping. NOTES: 1. Load balancing ONLY controls power made available to the VEHICLE. It does not control power to other equipment.
  • Page 8: Security - Tamper Protection

    5. In the event of a breach or attempted breach, the Chargepoint will log the incident and trigger an alert. Product Specification Figure 1 General Arrangement and Dimensions SecuriCharge Intelligent EV Charging Unit EVSM-V03-R0 Installation and Operation Manual Page 7 of 31 June 2025...
  • Page 9 Product Specification Figure 2 Separate Wall Mounting Bracket EVSM-V03-R0 Installation and Operation Manual SecuriCharge Intelligent EV Charging Unit Page 8 of 31 June 2025...
  • Page 10 MID Meter Payment Terminal (Socket 2) (Rear) – if fitted Incoming Power Socket 1 Terminals (Rear) Figure 4 Internal Components – Three-Phase - Typical Locations SecuriCharge Intelligent EV Charging Unit EVSM-V03-R0 Installation and Operation Manual Page 9 of 31 June 2025...
  • Page 11 Anti-Tamper Devices SIM Card Location SD Card Location CANBUS Connector RJ45 LAN Connector Figure 6 Smart Communications Module Figure 6 Smart Com USB Connector EVSM-V03-R0 Installation and Operation Manual SecuriCharge Intelligent EV Charging Unit Page 10 of 31 June 2025...
  • Page 12 Three Phase 62196) (32A) Black LCD screen ROLEC2123B 400V AC (±10 %) charging sockets per socket 50/60Hz LCD screen & contactless Black ROLEC3123B payment terminal SecuriCharge Intelligent EV Charging Unit EVSM-V03-R0 Installation and Operation Manual Page 11 of 31 June 2025...
  • Page 13: Options And Accessories

    RFID card RFID0020 RFID fob EVFP0065 SecuriCharge mounting post (fits 1 charger) EVFP0075 SecuriCharge mounting post (fits up to 2 chargers) GMHP0010 Ground mounting base for SecuriCharge mounting post EVCB0020 Root mount protection barrier – 48mm EVCB0040 Surface mount protection barrier – 48mm EVPS0010 EV parking sign –...
  • Page 14 Certifications – CE & UKCA Warranty 3 years Rolec Services Ltd are a registered manufacturer (WEE/AG3499TY) within the WEEE Recycling Scheme. When supplied as B2B EEE the producer invokes regulation 12.2 and passes all WEEE obligations to the B2B end user.
  • Page 15: Unpacking

    Installation must be carried out only by qualified and competent professionals in accordance with current regulations applicable to the location of the installation. Rolec Services Ltd accepts no responsibility for issues resulting from improper installation. NOTE: Any damage to the unit, connected systems, or surrounding property due to incorrect installation is the sole responsibility of the installer.
  • Page 16: Before Installation

    Units using mobile networks require a signal strength of 14 CSQ or better. Units using Wi-Fi require a strong, stable connection. Rolec cannot be held responsible if a unit using mobile networks or Wi-Fi is installed in an area with inadequate signal strength CAUTION: Equipment Damage –...
  • Page 17: If A Ground Mounting Base/Post Will Be Used

    5. Fix the mounting bracket securely to the wall. Make sure it is not twisted or warped in any way when secured. EVSM-V03-R0 Installation and Operation Manual SecuriCharge Intelligent EV Charging Unit Page 16 of 31 June 2025...
  • Page 18: Install The Chargepoint

    6. When Load Balancing has been installed, return to this point. 7. Route the incoming cables through the enclosure, ready to connect to the appropriate terminals within the enclosure. SecuriCharge Intelligent EV Charging Unit EVSM-V03-R0 Installation and Operation Manual Page 17 of 31...
  • Page 19: Install Load Balancing

    3. Open the CT clamp: Release the clip to open the clamp. 4. Install the CT clamp: Place the clamp around the identified cable. Ensure the arrow is pointing in the correct direction. EVSM-V03-R0 Installation and Operation Manual SecuriCharge Intelligent EV Charging Unit Page 18 of 31 June 2025...
  • Page 20: Extend The Ct Cable

    A CAT6 network cable with a screened twisted pair can be used. NOTE: Twisted pairs within a CAT6 cable are color-coded. - Do NOT use conductors with mismatched colours. SecuriCharge Intelligent EV Charging Unit EVSM-V03-R0 Installation and Operation Manual Page 19 of 31...
  • Page 21: Connect The Ct Cable To The Chargepoint

    Solar Monitoring CT for a solar system. Connections Figure 10 CT Connections for Load Balancing and Solar Monitoring EVSM-V03-R0 Installation and Operation Manual SecuriCharge Intelligent EV Charging Unit Page 20 of 31 June 2025...
  • Page 22: Configure Load Balancing

    IMPORTANT: Chargepoint management and operation applications, such as those provided by Monta or any other service provider, are not part of the Rolec product. Any agreements, contracts, or fees related to these services are between you and your chosen provider.
  • Page 23: Chargepoint Onboarding

    Statement of Compliance email sent to the purchase order address. If installing many Chargepoints at once, Rolec may be able to help using serial numbers linked to your order – Contact the onboarding team (using the number shown on page 1).
  • Page 24: Chargepoint Commissioning

    2. Download and Sign in to the App Download the Rolec Connect App from either the Apple App Store or Google Play Store, depending on your device. Sign up by entering your email address and full name (Image 1).
  • Page 25 Once all settings are applied, push the configuration to the Chargepoint (Images 9,10). Then test the connector(s) to confirm the Chargepoint is functioning correctly (Images 11,12). EVSM-V03-R0 Installation and Operation Manual SecuriCharge Intelligent EV Charging Unit Page 24 of 31 June 2025...
  • Page 26: Chargepoint Installation Completion

    4. If necessary, remove any handling marks from the enclosure using a soft, damp cloth. 5. Ensure this manual is given to the Owner/Host before leaving the site. SecuriCharge Intelligent EV Charging Unit EVSM-V03-R0 Installation and Operation Manual Page 25 of 31...
  • Page 27: Operation

    7. If you are present when power for charging is made available, you will see the status indicator change to a fixed green light. NOTE: Default Hours and Randomised Delay EVSM-V03-R0 Installation and Operation Manual SecuriCharge Intelligent EV Charging Unit Page 26 of 31 June 2025...
  • Page 28: End A Charging Session

    Unplugging and reconnecting the plug and socket also helps ensure a good electrical connection and relieves any strain on the components. SecuriCharge Intelligent EV Charging Unit EVSM-V03-R0 Installation and Operation Manual Page 27 of 31...
  • Page 29: About Charging Cables

    Operation About Charging Cables The points below apply to Rolec cables and will be similar for cables supplied by other manufacturers. Always follow the manufacturer's advice. 1. Charging cables should be fully uncoiled when in use. 2. Charging cables should not be stretched or placed under strain on the Chargepoint or vehicle connections.
  • Page 30: Maintenance

    NOTE: In the event of a hardware issue, always contact your installer first. If damage has been sustained to communications devices and/or other ‘Smart’ components, it is recommended that an approved Rolec installer is called to perform the repair. Damage caused to the equipment by misuse, lack of maintenance, inappropriate maintenance or modification is not covered by the manufacturer warranty.
  • Page 31: About Software Updates

    5. When the LED status indicator for all sockets/cables flashes BLUE, the charge point is ready for use again. NOTE: As with a phone or computer, updates of the charge point software need a strong stable connection. EVSM-V03-R0 Installation and Operation Manual SecuriCharge Intelligent EV Charging Unit Page 30 of 31 June 2025...
  • Page 32: Suggested Inspection And Testing

    SecuriCharge Intelligent EV Charging Unit EVSM-V03-R0 Installation and Operation Manual Page 31 of 31...
  • Page 36 This listing of any firm or their logos is not intended to imply any endorsement or direct affiliation with Rolec Services Ltd. and is purely to demonstrate branding opportunities. © 2025 by Rolec Services. All rights reserved. EVSM-V03-R0 SecuriCharge Intelligent EV Charging Unit - Installation and Operation Manual Manufactured in the UK t: 01205 724754 e: enquiries@rolecserv.co.uk...

Table of Contents