Cisco N9K-C93400LD-H1 Hardware Installation Manual
Cisco N9K-C93400LD-H1 Hardware Installation Manual

Cisco N9K-C93400LD-H1 Hardware Installation Manual

Aci-mode switch
Table of Contents

Advertisement

Quick Links

Cisco Nexus 93400LD-H1 ACI-Mode Switch Hardware Installation
Guide
First Published: 2025-02-14
Last Modified: 2025-04-04
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the N9K-C93400LD-H1 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Preface
Audience
Defines the intended audience for this hardware installation guide.
Documentation Conventions
Explains the typographical conventions and syntax used in the document.
Related Documentation
Web-Based Documentation
Lists Cisco ACI documentation available online through web resources.
Downloadable Documentation
Lists Cisco ACI documentation available for download.
CHAPTER 1 Overview
Port Considerations
Details important considerations regarding the switch's network ports.
CHAPTER 2 Preparing the Site
Temperature Requirements
Specifies the acceptable ambient temperature ranges for the switch.
Humidity Requirements
Outlines the humidity levels suitable for switch operation and storage.
Altitude Requirements
Defines the altitude limits within which the switch can operate.
Dust and Particulate Requirements
Provides guidelines for maintaining a clean environment to prevent contamination.
Minimizing Electromagnetic and Radio Frequency Interference
Offers methods to reduce EMI and RFI affecting the switch and other devices.
Shock and Vibration Requirements
Covers the switch's resilience to shock and vibration during operation and handling.
Preventing Electrostatic Discharge Damage
Details precautions to protect components from ESD damage.
Grounding Requirements
Explains the necessary grounding procedures for the switch chassis.
Planning for Power Requirements
Covers considerations for planning adequate power for the switch.
Airflow Requirements
Describes the airflow considerations for cooling the switch.
Rack and Cabinet Requirements
Specifies the standards for racks and cabinets suitable for switch installation.
Clearance Requirements
Details the necessary clearances around the chassis for airflow and access.
Cautions and Regulatory Compliance Statements for NEBS
Lists safety cautions and regulatory compliance for NEBS certification.
CHAPTER 3 Installing the Chassis
Safety
Highlights critical safety instructions and definitions for equipment handling.
Installation Options with Rack-Mount Kits
Describes various rack-mount kit options for installing the switch.
Airflow Considerations
Explains how to position the switch for optimal airflow during installation.
Installation Guidelines
Provides essential guidelines to follow during the switch installation process.
Unpacking and Inspecting the Switch
Details the procedure for unpacking and checking the switch for damage.
Installing the Switch Using the NXK-ACC-KIT-1RU Rack-Mount Kit
Step-by-step guide for installing the switch with a specific rack-mount kit.
Installing the Switch into a Two-Post Rack Using the NXK-ACC-KIT-2P Rack-Mount Kit
Guide for installing the switch into a two-post rack using a specific kit.
Grounding the Chassis
Provides detailed instructions for grounding the switch chassis.
Starting the Switch
Explains the procedure for powering on and starting the switch.
CHAPTER 4 Connecting the Switch to the ACI Fabric
ACI Fabric Topology
Describes the architecture and components of the ACI fabric.
Preparing to Connect to Other Devices
Lists items to consider before connecting fabric devices.
Connecting Leaf Switches to APICs
Details how to connect leaf switches to the APIC controllers.
Connecting Leaf Switches to Spine Switches
Explains how to connect leaf switches to spine switches in the fabric.
Replacing an Existing Switch in the ACI Fabric
Provides guidance on replacing a switch within the ACI fabric.
Setting Up an Optional Console Interface
Guides on configuring an optional console connection for initial setup.
Setting Up an Optional Management Connection
Details how to establish an out-of-band management connection.
Maintaining Transceivers and Optical Cables
Offers guidelines for maintaining optical components for optimal performance.
CHAPTER 5 Replacing Components
Replacing a Fan Module
Instructions for safely replacing a fan module in the switch.
Replacing a Power Supply Module
Procedures for replacing power supply modules in the switch.
Installing and Removing Small-Form Pluggable Modules
Guides for handling SFP and SFP+ modules.
Install and Remove OSFP/QSFP Transceiver Modules
Instructions for installing and removing OSFP/QSFP transceivers.
Attaching the Optical Network Cable
Details on connecting optical network cables to transceivers.
Removing the Transceiver Module
Step-by-step guide for removing transceiver modules.
APPENDIX A Rack Specifications
Overview of Racks
Provides a general overview of different types of racks and cabinets.
General Requirements for Cabinets and Racks
Lists standard requirements for installing equipment in racks.
Requirements Specific to Standard Open Racks
Details specific requirements for open rack installations.
Requirements Specific to Perforated Cabinets
Outlines specific requirements for perforated cabinets.
Cable Management Guidelines
Offers advice on managing cables within the rack for better organization.
APPENDIX B System Specifications
Environmental Specifications
Lists the environmental operating conditions for the switch.
Switch Dimensions
Provides the physical dimensions of the Cisco Nexus 93400LD-H1 switch.
Switch and Module Weights and Quantities
Details the weight and quantity of the switch and its modules.
Switch Power Input Requirements
Specifies the typical and maximum power consumption of the switch.
Power Specifications
Provides detailed specifications for the switch's power supply modules.
Power Cable Specifications
Lists available power cables for different regions and power supply types.
APPENDIX C LEDs
Switch Chassis LEDs
Describes the status and color indicators for chassis LEDs.
Fan Module LEDs
Explains the status LEDs for the fan modules.
Power Supply LEDs
Details the status indicators for the power supply modules.
APPENDIX D Additional Kits
Rack Mount Kit N3K-C3064-ACC-KIT
Contents and illustration for the N3K-C3064-ACC-KIT rack mount kit.
Rack Mount Kit for a Two-Post Rack
Contents and illustration for the two-post rack mount kit (NXK-ACC-KIT-2P).
Airflow Sleeve
Details and illustration for the N9K-AIRFLOW-SLV airflow sleeve.
APPENDIX E Site Preparation and Maintenance Records
Site Preparation Checklist
A checklist of tasks for preparing the installation site.
Contact and Site Information
Worksheet to record contact and site details for the installation.
Chassis and Module Information
Worksheet to record switch and module hardware details.

Table of Contents