Download Print this page
FLYFANS SU-27 Twin Quick Start Manual

FLYFANS SU-27 Twin Quick Start Manual

64mm edf rc jet

Advertisement

Quick Links

SUKHOI SU-27 FLANKER
64mm EDF RC JET
SPECIFICATIONS
Wingspan: 930mm
Length: 1380mm
Dry weight: 800g
Flying weight: 2300g (Full loading)
Wing loading: 72g/dm²
KIT
40g Retracting
KIT
Shock Absorber
9g Metal Servo x 5 (In-
Landing Gear
stalled)
9g Servo x 2 (Installed)
RECOMMENDED BATTERY
3300-4700mAh 6S High Discharge Lipo
KIT TYPE
KIT + Servos
ELECTRONIC
Power System: 2840/2300KV 64EDF x 2
ESC: 40A ESC x 2 + 5V5A BEC
Servos: 9g servos x 7
Battery: 3300-4700mah 6s Lipo
Radio: 6 Channel TX and RX
KIT
9g Metal Servo x 5 (Installed)
9g Servo x 2 (Installed)
40A ESC x 2 (Installed)
6S: 2840-2300KV 64mm EDF x 2 (Installed)
PNP
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the SU-27 Twin and is the answer not in the manual?

Questions and answers

Summarization of Contents

Model Assembly
Rudder Servo Installation
Instructions for installing rudder servos onto the rudder.
Aileron Servo Installation
Instructions for installing aileron servos onto the wing.
Front Wheel Servo Installation
Instructions for installing the front wheel servo and linkages.
EDF and ESC Installation
Steps for installing the Electric Ducted Fans (EDFs) and Electronic Speed Controllers (ESCs).
Stabilator Servo Wiring
Connecting and routing stabilator servo wires using a Y-cable for proper function.
EDF and Cover Securing
Securing the EDF units and their covers with screws for a stable fit.
ESC Compartment Cover Attachment
Attaching the ESC compartment cover securely using glue.
Vertical Stabilizer Attachment
Attaching vertical tail fins and connecting rudder servo connectors.
Stabilator Mounting Procedure
Securing the left and right stabilators to their respective mounts with screws.
Control Surface Pushrod Adjustment
Adjusting pushrod lengths and installing ball links for control surface alignment.
Main Wing and Spar Installation
Inserting the carbon spar into the fuselage and installing the main wings.
Receiver Connection and Placement
Connecting the receiver and placing it within the battery compartment.
Nosecone and Tail Boom Assembly
Attaching the nosecone with magnets and gluing the tail boom to the fuselage.
Flight Setup
Battery Installation Procedure
Instructions for correctly securing the battery in the aircraft's compartment.
Center of Gravity (CG) Verification
Guidance on locating and adjusting the aircraft's center of gravity for stable flight.
Dual Rate Setting Recommendations
Recommendations for dual rate settings for improved flight control and experience.
Model Control Surface Configuration
Visual guide for setting up control surfaces for optimal flight performance.
Control Surface Alignment
Neutral Position Alignment Guide
Aligning rudder, aileron, and stabilator to their neutral positions for calibration.