Daikin RXA-A8 Installation Manual

Daikin RXA-A8 Installation Manual

R32 split system air conditioners
Table of Contents

Advertisement

Installation manual
R32 Split system air conditioners
RXA20A5V1B8
Installation manual
RXA25A5V1B8
English
R32 Split system air conditioners
RXA35A5V1B8

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RXA-A8 and is the answer not in the manual?

Questions and answers

Summarization of Contents

About the Documentation
About This Document
Provides an overview of the installation manual and its components.
Specific Installer Safety Instructions
General Safety Warnings
Crucial safety advice on refrigerant, electrical hazards, and handling.
About the Box
Outdoor Unit
Details about the outdoor unit and its accessories.
To Remove the Accessories from the Outdoor Unit
Instructions for accessing and removing accessories included with the outdoor unit.
Unit Installation
Preparing the Installation Site
Guidelines for selecting and preparing a suitable location for installing the outdoor unit.
Installation Site Requirements of the Outdoor Unit
Specifies required clearances and spacing for the outdoor unit installation.
Additional Installation Site Requirements of the Outdoor Unit in Cold Climates
Special considerations for installing the unit in areas with heavy snowfall.
Mounting the Outdoor Unit
Instructions on how to physically mount the outdoor unit.
To Provide the Installation Structure
Details on preparing the mounting structure, including anchor bolts and vibration-proof measures.
Piping Installation
To Install the Outdoor Unit
Step-by-step instructions for physically installing the outdoor unit onto its mounting structure.
To Provide Drainage
Procedures for ensuring proper drainage for the outdoor unit, especially in cold climates.
Preparing Refrigerant Piping
Requirements and considerations for preparing the refrigerant piping before installation.
Refrigerant Piping Requirements
Specifies materials, dimensions, and connection types for refrigerant piping.
Refrigerant Piping Insulation
Guidelines for insulating refrigerant piping to prevent condensation and heat loss.
Refrigerant Piping Length and Height Difference
Details maximum allowable lengths and height differences for refrigerant piping.
Connecting the Refrigerant Piping
To Connect the Refrigerant Piping to the Outdoor Unit
Specific instructions for connecting the piping to the outdoor unit's stop valves.
Checking the Refrigerant Piping
Procedures for verifying the integrity of the refrigerant piping system.
To Check for Leaks
Methods for detecting leaks in the refrigerant piping connections.
To Perform Vacuum Drying
Process for removing moisture and air from the refrigerant system.
Charging Refrigerant
About the Refrigerant
Information about the refrigerant type (R32) and its properties, including GWP.
To Determine the Additional Refrigerant Amount
Calculation method for determining the extra refrigerant needed based on piping length.
To Determine the Complete Recharge Amount
How to calculate the total refrigerant required, including factory charge.
To Charge Additional Refrigerant
Step-by-step guide for adding extra refrigerant to the system.
To Check Refrigerant Piping Joints for Leaks After Charging Refrigerant
Re-checking for leaks after refrigerant has been charged.
To Fix the Fluorinated Greenhouse Gases Label
Instructions for applying the refrigerant charge label with CO2 equivalent.
Electrical Installation
DANGER: RISK OF ELECTROCUTION
Critical safety warning regarding the dangers of electrical shock during installation.
Specifications of Standard Wiring Components
Details on required power supply, cables, and circuit breakers for electrical connections.
To Connect the Electrical Wiring to the Outdoor Unit
Step-by-step instructions for making electrical connections to the outdoor unit.
Finishing the Outdoor Unit Installation
To Finish the Outdoor Unit Installation
Procedures for insulating and securing piping and cables, and installing covers.
Configuration
Facility Setting
Information about the facility setting for low outdoor temperature cooling.
To Set the Facility Mode
Steps to activate the facility mode by cutting jumper J6.
Commissioning
Checklist Before Commissioning
A checklist of items to verify before starting the commissioning process.
Checklist During Commissioning
Items to check while the unit is operating during commissioning.
To Perform a Test Run
Instructions for conducting a test run to verify proper operation.
Maintenance and Service
General Maintenance/Inspection Checklist
A checklist for routine maintenance and inspection of the unit.
Troubleshooting
Fault Diagnosis Using LED on Outdoor Unit PCB
How to diagnose unit faults by observing the LEDs on the outdoor unit's printed circuit board.
Technical Data
Wiring Diagram
Reference to the unit's wiring diagram for installation and troubleshooting.
Unified Wiring Diagram Legend
Explanation of symbols and codes used in the wiring diagram for easy reference.

Table of Contents