Installation; Disassembly; Cleaning And Inspection; Assembly - BENDIX ET-2 ELECTRONIC THROTTLE Manual

Electronic treadle
Table of Contents

Advertisement

DIODES
IDLE
VALIDATION
SWITCH
PEDAL
POSITION
SENSOR
FIGURE 8 - ET-2
TREADLE ELECTRICAL TEST SCHEMATIC FOR THE CUMMINS CONNECTOR

INSTALLATION

1. Install the assembled ET-2
2. Reconnect the cable connector by plugging it into the
potentiometer's integral connector and pushing until
the lock tab snaps into place.

DISASSEMBLY

The following instructions present a major disassembly of
the ET-2
treadle. They are included for reference only.
Several replacement parts and maintenance kits that do
not require full disassembly are available. The instructions
provided with those items should be followed in lieu of the
steps presented here. Refer to Figure 4 throughout the
procedures.
1. Remove the treadle cover (1).
2. Remove the pivot pin's snap ring (8).
3. Remove the pivot pin (9) and the two nyliner bearings
(10) from the treadle's exterior. Also remove the two
nyliner bearings (10) from the mounting base.
4. Remove the pivot spring (11).
5. Remove the screws (3) that secure the potentiometer
(2) to the treadle. Remove the potentiometer.
6. Remove the lever shaft's snap ring (5).
7. Remove the lever shaft (4) and the washer (7). Then
remove the roller assembly (15), the inner washer (5),
and the nyliner bearing (6) from the treadle. Separate
the treadle from the mounting base.
6
TEST
TEST
LOAD
LOAD
470
470
OHM
OHM
PIN 6
PIN 2
PIN 1
PIN 5
PIN 3
.01µ F
PIN 4
TEST LOAD
47000 OHM
treadle on the vehicle.
Closed Throttle (open) Range: 5-17%
Vs
SUPPLY
Open Throttle (full) Range: 70-81%
VOLTAGE
V3 (LOGIC HIGH AT IDLE)
V2 (LOGIC LOW AT IDLE)
IVS GROUND
APS GROUND
Vs
SUPPLY
VOLTAGE
V1
(OUTPUT)
APS
GROUND
(OUTPUT) SIG1
8. The roller assembly consists of the lever, roller, two
springs (12 & 13), and a spring support (14). Remove
the springs and the spring support from the lever.
CLEANING & INSPECTION
1. Use mineral spirits or an equivalent solvent to clean all
metal parts. Be sure to thoroughly dry the parts.
2. Inspect the treadle and mounting base for severe
corrosion, pitting, or cracks. Replace as necessary.
Superficial corrosion and/or pitting is acceptable.
3. Inspect the cable assembly for loose or frayed wires,
physical damage, or any contaminants on the
connectors. Check end-tend electrical continuity at
terminals. Replace as necessary.

ASSEMBLY

Refer to Figure 4 throughout the assembly procedure.
1. Install the four nyliner bearings (10) on the mounting
base and treadle.
2. Place the treadle "ears" outside the mounting base
"ears" so that the holes line up.
3. Install the pivot spring (11) into the base and treadle.
The curved end of the spring fits into a small hole in the
treadle, and the straight end fits into a small hole in the
mounting base.
4. The pivot pin (9) should slide through the holes in the
"ears" of the treadle and base assembly, then through
the center of the spring. Secure the pin with its snap
ring (8). Make sure the pivot spring is straight and is
seated in its holes.
LOCK TAB
5
VS
(INPUT)
4
3
V1
IVS GROUND
2
(IVS) V 2
POTENTIOMETER
SET VOLTAGE
AND PC. NO.
SHOWN
HERE
6
(IVS)
V 3
LOCK TAB
1

Advertisement

Table of Contents
loading

Table of Contents