Several weekly schedules for one task
In the case when the task needs to be run on different days of the weeks with different time
intervals, consider adding a dedicated schedule to every desired day of the week, or to several days.
For example, you need the task to be run with the following schedule:
•
Monday: twice at 12 PM (noon) and 9 PM
•
Tuesday: every 3 hours from 9 AM till 9 PM
•
Wednesday: every 3 hours from 9 AM till 9 PM
•
Thursday: every 3 hours from 9 AM till 9 PM
•
Friday: twice at 12 PM and 9 PM (i.e. same as on Monday)
•
Saturday: once at 9 PM
•
Sunday: once at 9 PM
Combining the identical times, the following three schedules can be added to the task:
First schedule
1. Every: 1 week(s) on: Mon, Fri.
2. Every: 9 hours
From: 12:00:00 PM Until: 09:00:00 PM.
3. Effective:
From: not set.
To: not set.
Second schedule
1. Every 1 week(s) on: Tue, Wed, Thu.
2. Every 3 hours
From 09:00:00 AM until 09:00:00 PM.
3. Effective:
From: not set.
To: not set.
Third schedule
1. Every: 1 week(s) on: Sat, Sun.
2. Once at: 09:00:00 PM.
3. Effective:
From: not set.
To: not set.
92
Copyright © Acronis, Inc., 2000-2009