6.5 to 35.0 kw wall mounted gas condensing boiler. natural gas version (112 pages)
Summary of Contents for Viessmann PV1B
Page 1
VIESMANN Service instructions for contractors Vitoplex 100 Type PV1B, 780 to 2000 kW 08 to 13 Oil/gas boiler VITOPLEX 100 Please keep safe. 5461424 GB 9/2018...
Page 2
Danger system. Hot surfaces and fluids can lead to burns or Replace faulty components only with genuine scalding. Viessmann spare parts. Before maintenance and service work, switch ■ OFF the appliance and let it cool down. ■ Never touch hot surfaces on the boiler, burner,...
For replacements, use only original spare parts supplied or approved by Viessmann. Safety instructions for operating the system If you smell gas Condensate Danger...
Page 4
Index Index Information Symbols ....................Intended use ..................Product information ................Commissioning, inspec- Steps - commissioning, inspection and maintenance ......tion, maintenance Parts lists Ordering parts ..................17 Boiler body assembly ................18 Thermal insulation assembly ..............20 Water quality Water quality requirements ..............
Information Symbols The steps in connection with commissioning, inspec- Symbol Meaning tion and maintenance are found in the "Commission- Reference to other document containing ing, inspection and maintenance" section and identified further information as follows: Step in a diagram: Symbol Meaning The numbers correspond to the order in Steps required during commissioning...
Page 6
Information Product information Vitoplex 100, type PV1B ■ Fuels: Fuel oil and natural gas ■ Permissible operating pressure 6 bar (0.6 MPa) ■ Rated heating output 780 to 2000 kW...
Page 7
Commissioning, inspection, maintenance Steps - commissioning, inspection and maintenance Commissioning steps Inspection steps Maintenance steps Page • • • 1. Commissioning the system....................• • 2. Shutting down the system....................• • 3. Opening the boiler door and cleaning cover..............•...
Commissioning, inspection, maintenance Commissioning the system Operating and service instructions for the control 11. The dew point range must be cleared as quickly unit and the burner as possible. For this reason prevent all heat sup- ply to consumers when heating the system from 01.
Commissioning, inspection, maintenance Opening the boiler door and cleaning cover Note On gas burners, disconnect the gas supply pipe. Fig. 1 Danger Cleaning cover When working with high temperature insulation The version of cleaning cover on the flue gas collector materials that contain zirconium or aluminium depends on the output rating.
Commissioning, inspection, maintenance Cleaning the turbulators, heating surface, flue outlet and flue pipe 1. Remove turbulators without applying force using the turbulator extractor supplied. 2. Clean flues and combustion chamber with the brush. Remove combustion residues with a vacuum cleaner. Fig.
Commissioning, inspection, maintenance Inserting the turbulators (cont.) 1. Push turbulators approx. of their length into ¼ hot gas flues 2. Bend turbulators approx. 10 to 15°. 3. Push the turbulators into the hot gas flues as far as they will go. When doing this, check the pre-stress- ing.
Commissioning, inspection, maintenance Checking the temperature controller setting if a building management system is used (DCC system) Please note Shutting down from full load can result in high material stress and material damage to the boiler. If a system with a higher ranking building man- agement system takes over the temperature control of the boiler, adjust the settings at the temperature controller TR.
Commissioning, inspection, maintenance Checking the expansion vessel and system… (cont.) Pump controlled pressure maintaining systems In heating systems with automatic pressure maintain- Pump controlled pressure maintaining systems with ing systems also provide individual protection by instal- atmospheric deaeration through cyclical pressure ling an expansion vessel for each boiler.
Commissioning, inspection, maintenance Cleaning the sight glass in the boiler door Fig. 6 Check the gaskets and hose connection for tightness. Checking the mixer for ease of operation and tightness 1. Remove the motorised lever from the mixer han- 3. Check the mixer for leaks. In the event of a leak, dle.
Commissioning, inspection, maintenance Adjusting the burner (cont.) The minimum boiler water temperature for oil and gas operation is 75 °C. Ensure the (minimum) boiler return temperature of 65 °C. Partial load operation Set the minimum heating output for the base load This extends the service life and reduces running stage in accordance with the flue system.
Page 16
Commissioning, inspection, maintenance Operating and service documents (cont.)
Parts lists Ordering parts The following details are required when ordering parts: ■ Serial no. (see type plate) ■ Position number of the part from this parts list Parts not shown Pos. Part 0001 Touch-up spray paint, Vitosilver 0002 Touch-up paint stick, Vitosilver 0003 Installation instructions...
Page 21
Fixing rail, right front & left back 0008 Fixing rail, left front & right back 0009 Centre rail 0010 Corner rail, right front (with logo) 0011 Vitoplex 100 logo 0012 Thermal insulation jacket 0013 Thermal insulation jacket, centre 0014 Thermal insulation mat, top back 0015...
Water quality Water quality requirements Note Observation of the following requirements is a neces- sary condition for safeguarding your warranty rights. The warranty excludes damage due to corrosion and scaling. Heating systems with rated operating temperatures up to 100 °C (VDI 2035) Prevent excessive scale build-up (calcium carbonate) The build-up of limescale deposits on the heating sur- on the heating surfaces.
2 and EN 14868. Using antifreeze in boilers Viessmann boilers are designed and built for water as The quality of the boiler water and feedwater must ■ a heat transfer medium. To protect boiler systems from meet the requirements of Directive VDI 2035.
Commissioning/service reports Water quality Meter Fill and top- Total water Total hardness pH value Water treatment Date reading up water volume Feedwater Boiler wa- Medium Dosing volume Maintenance/service Commissioning Maintenance/service Maintenance/service Date: Commissioning Maintenance/service Maintenance/service Date: Commissioning Maintenance/service Maintenance/service Date:...
Page 26
Specification Specification Rated heating output 1120 1350 1700 2000 Flue gas parameters Temperature at a boiler water tempera- ture of 80 °C At rated heating output °C – At partial load (60 %) °C – Product ID CE-0085BP0365 Standard seasonal efficiency [to DIN] (for operation with fuel oil/natural gas) 88 (H ) [gross cv]...
Decommissioning and disposal Final decommissioning and disposal Viessmann products can be recycled. Components For decommissioning the system, isolate the system and substances from the system are not part of ordi- from the power supply and allow components to cool nary household waste.
This product meets the requirements of the Efficiency Directive (92/42/EEC) The product characteristics determined as system values for the product Vitoplex 100, type PV1B, as part of EC type testing can be used to assess the energy efficiency of heating and ventilation systems in buildings to DIN V 4701-10, as specified by the EnEV [Germany] (see Specification table).
Page 29
Keyword index Keyword index Boiler door Operating and service documents......15 – Opening..............9 – Securing..............11 Building management system........12 Parts Burner adjustment............14 – Boiler body.............. 18 – Ordering..............17 – Thermal insulation...........20 Chemicals for corrosion protection......23 Pressure switch function, checking......12 Cleaning cover Product information............
Need help?
Do you have a question about the PV1B and is the answer not in the manual?
Questions and answers