Thermo King Precedent S-610DE Installation Manual

Thermo King Precedent S-610DE Installation Manual

Multi-temperature systems for trailers
Table of Contents

Advertisement

Installation Manual
Trailer Edition
Precedent™ ™
Multi-Temperature Systems
I I n n s s t t a a l l l l a a t t i i o o n n M M a a n n u u a a l l ( ( A A ) )
C-600M, S-610M and S-610DE Host Unit Installation
May 2021
T T K K 5 5 5 5 7 7 4 4 5 5 - - 2 2 - - I I M M - - E E N N
Revision G

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Precedent S-610DE and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety Precautions
Hazard Identification and Definitions
Defines hazard symbols (Danger, Warning, Caution, Notice) and outlines general safety practices.
Operational Safety Warnings
Covers risks related to moving parts, electrical hazards, improper drilling, and battery installation.
Chemical and First Aid Safety
Details hazards of refrigerants, oils, and engine coolant, with corresponding first aid procedures.
Trailer Integration Requirements
Trailer Clearance and King Pin Specifications
Specifies required trailer swing radius clearance and king pin positioning for safe installation.
Evaporator Opening and Mounting Bolt Specs
Details requirements for the trailer's evaporator opening and unit mounting bolt specifications.
Unit Specifications and Handling
Unit Dimensions and Fairing Notes
Provides front, rear, and side view dimensions, including notes on top fairing variations.
Unit Weight Information
Lists approximate weights for various Precedent multi-temperature unit configurations.
Installation Tools and Components
Essential Installation Tools List
Lists all necessary tools and equipment required for the unit installation process.
Required Installation Kit Components
Identifies the various kits and parts provided for trailer unit installation.
Unit Preparation and Mounting
Safe Unit Unpacking Procedure
Provides step-by-step instructions for safely removing the unit from its protective packaging.
Heat Shield Installation on Trailer
Guides on correctly positioning and applying the heat shield to the trailer wall prior to unit mounting.
Unit Mounting and Securing
Details the process of lifting, positioning, and securing the unit to the trailer mounting bolts.
Accessing Unit Mounting Bolt Locations
Identifies specific points on the trailer for accessing the unit mounting bolts.
System Connections and Lines
Drain and Coolant Hose Installation
Explains the proper routing and securing of evaporator drain and coolant overflow hoses.
Fuel Line Installation
Provides safety and installation procedures for fuel lines on C-Series and S-Series units.
Fuel Lines for Trailer/TOFC Applications
Details fuel line routing and connection for trailer and TOFC models.
S-Series Fuel Line Setup (Without Heater)
Guides installation of fuel lines for S-Series units not equipped with an optional fuel heater.
S-Series Fuel Line Setup (With Heater)
Details fuel line installation for S-Series units that include an optional fuel heater.
Electrical and Sensor Installation
UFLS Harness Installation and Routing
Covers the process of installing and routing the Ultrasonic Fuel Level Sensor (UFLS) harness.
UFLS Harness Connection Details
Specifies the required wire connections at both the control box and the fuel sensor.
SmartPower Receptacle Installation
Guides the installation of the SmartPower receptacle for external power connectivity.
LED Clearance Lighting Connection
Provides instructions for connecting optional LED clearance lights to the trailer's electrical system.
Final Assembly and Checks
Battery Installation Procedure
Details the steps for safely installing the 12-volt group 31 battery into the unit.
Top Covers and Bottom Pan Installation
Explains how to install top covers and the bottom pan, considering trailer height limits.
Completing Installation for Specific Units
Offers final steps and critical information for 3-zone and 2-zone unit installations.

Table of Contents