Advertisement

Quick Links

S SERIES PUMPS
All Materials And Voltages
GORMAN‐RUPP PUMPS
PUBLICATION NUMBER MR-04319
August 8, 1995
Rev. C 08‐08‐15
S8D
www.grpumps.com
e
1995 Gorman‐Rupp Pumps
Printed in U.S.A.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S8D Series and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety - Section A
Pre-Service Safety Precautions
Essential safety steps to take before attempting to open or service the pump assembly.
Operational Hazard Warnings
Alerts personnel to specific hazards and unsafe practices during pump operation and maintenance.
Troubleshooting - Section B
Troubleshooting Chart
Guide to diagnose and resolve common pump operational issues and their probable remedies.
Test Equipment
Lists and describes the necessary test equipment for electrical troubleshooting.
Voltage Imbalance Testing
Procedure to check for and correct voltage imbalances in three-phase power supply to the pump.
Motor and Power Cable Continuity Testing
Steps to verify the continuity of motor windings and power cable connections.
Insulation Resistance Testing
Methodology for checking the insulation resistance of the power cable and motor windings.
Pump Maintenance and Repair - Section C
General Maintenance Information
Provides general guidelines, safety reminders, and references for pump maintenance and repair procedures.
Lifting Procedures
Guidelines for safely lifting the pump and its components using appropriate equipment.
Pump End Disassembly
Detailed instructions for disassembling the pump end, including strainer, impellers, and seals.
Motor Disassembly
Steps and precautions for disassembling the pump motor, typically for component replacement.
Stator and Bearing Maintenance
Procedures for removing the stator and installing bearings, including necessary precautions.
Rotor Installation
Instructions for installing the rotor and shaft assembly into the motor housing.
Terminal Housing and Cable Reassembly
Procedures for reassembling the terminal housing and power cable connections.
Sealing Terminal Housing Connections
Methods for sealing terminal housing connections using silicone adhesive or potting compound.
Terminal Housing and Cable Installation
Steps for installing the sealed terminal housing and power cable assembly onto the motor.
Final Assembly
Guidance on reassembling the pump components after maintenance or repair.
Vacuum Testing Procedures
Steps for performing vacuum tests to ensure the water-tight integrity of motor and seal cavities.
Lubrication and Oil Specifications
Instructions for checking, filling, and maintaining oil levels in seal and motor cavities, including oil specifications.

Table of Contents