Avaya 5520-48T-PWR Installation Manual

Avaya 5520-48T-PWR Installation Manual

Ethernet routing switch
Table of Contents

Advertisement

Avaya Ethernet Routing Switch 5000
Series Installation
6.0
NN47200-300, 04.06 (217461-C, Rev. 04)
December 2010

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 5520-48T-PWR and is the answer not in the manual?

Questions and answers

Summarization of Contents

Chapter 1: Regulatory Information and Safety Precautions
International Regulatory Statements of Conformity
Evaluates equipment against international EMC and safety standards.
National Electromagnetic Compliance (EMC) Statements
Details FCC and other national EMC compliance statements.
National Safety Statements of Compliance
Outlines compliance with national safety standards like EN 60950.
National Environmental Statements of Compliance
Covers environmental compliance requirements for the equipment.
Chapter 2: New in this Release
Release 6.0 Features and Changes
Details new functionality, changes, and power options for Release 6.0.
Chapter 4: Installation Fundamentals
Electrostatic Discharge Prevention
Provides procedures and guidelines for preventing ESD damage during installation.
Ethernet Routing Switch 5000 Series Models
Lists different models of the 5000 Series switches and their key features.
Placement Options and Cables
Describes available placement options and requirements for cables.
Connecting a Transceiver to the Switch
Details procedures for connecting SFP and XFP transceivers to the switch.
Preparing for Power Requirements
Covers power requirements and specifications for various switch models.
Chapter 5: Installing the Switch
Installation Tasks Workflow
Outlines the sequence of tasks for installing the switch, including prerequisites.
Installation Preparation Steps
Details procedures for preparing the environment and verifying contents.
Switch Placement Options
Describes methods for mounting switches on tables, walls, or racks.
Power Connection and Hardware Verification
Details steps for connecting power and verifying hardware installation.
Network Connectivity and IP Configuration
Covers preparations for network connectivity and IP address configuration.
Stack Configuration
Provides steps for configuring switches in a stack.
Chapter 6: Procedures for Installation of the Switch
Installation Preparation and Site Setup
Provides steps for preparing the switch installation and verifying the environment.
Verifying Package Contents
Guides on how to check all delivered components for the switch.
Switch Placement Methods
Describes mounting switches on tables, walls, or in equipment racks.
Chapter 8: Installation Reference
RJ-45 Connector Pin Assignments
Details pin assignments for RJ-45 connectors on 5500 Series switches.
Console Port and AC Power Cord Specifications
Outlines console port pin assignments and AC power cord specifications.
Chapter 9: Customer Service
Getting Technical Documentation and Training
Information on accessing technical publications and product training.
Getting Technical Support
Guidance on obtaining technical support via the Avaya website.

Table of Contents