Viessmann TectoCell Standard Plus 100 Installation And Operating Instructions Manual

Viessmann TectoCell Standard Plus 100 Installation And Operating Instructions Manual

Cold rooms and deep-freeze rooms.

Advertisement

VIESMANN
Installation and Operating Instructions
for the specialist
TectoCell Standard Plus 80 cold rooms and deep-freeze rooms
TectoCell Standard Plus 100 cold rooms and deep-freeze rooms
TectoCell Standard Plus 120 deep-freeze room
TectoCell Standard Plus 150 deep-freeze room
Please save!
03/2019
5777744-03 GB

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TectoCell Standard Plus 100 and is the answer not in the manual?

Questions and answers

Summarization of Contents

User Guide and Document Structure
1.1 Target Group
Identifies authorized specialists and qualified electricians for specific tasks.
1.2 Operating Instructions Structure
Explains the manual's warning system and instruction format.
1.3 Related Documents
Advises consulting additional documents and relevant standards for safe operation.
1.4 Safekeeping
Instructs to keep the operating manual and related documents accessible near the device.
Product Symbols and Safety Warnings
1.5 Product Symbols
Explains symbols found on the product for identification and safety.
DANGER! Electric Shock from Electrical Work
Critical safety warning regarding electrical work and the necessity of power disconnection.
DANGER! Electric Shock from Mechanical Work on Door
Safety warning against mechanical work on doors or portholes to prevent electrical hazards.
Damage from Impermissible Bearing Load
Caution about exceeding load limits and ensuring structural support.
Corrosion from Unalloyed Steel Installation
Warning on preventing and cleaning corrosion from unalloyed steel contact.
Transport, Intended Use, and Misuse
3.1 Delivery
Details delivery condition, pre-mounted components, and contents of the control panel.
3.1.1 Unpacking
Provides instructions for unpacking, inspecting for transport damage, and reporting issues.
2.1 Intended Use
Defines the proper application of TectoCell rooms for cooling commercial refrigerated products.
2.2 Foreseeable Misuse
Outlines prohibited uses, such as mobile applications or exposure to weather.
Assembly - Initial Steps and Conditions
DANGER! Electric Shock from Door/Porthole Mechanical Work
Reiterates the safety warning against mechanical work in the door/porthole safety zone.
Damage from Improper Handling
Warns against damaging element seal profiles during handling.
Damage from Improper Transport
Advises on proper handling to prevent panel separation during transport.
Damage from Improper Mounting of Room Elements
Emphasizes correct mounting of room elements for structural integrity.
Damage from Improper Mounting Preparatory Work
Stresses the importance of preparatory work for unit mounting onto elements.
Installation Space Requirements
Specifies requirements for the installation environment, including ventilation and clearances.
Outdoor Installation Conditions
Details necessary precautions and measures for outdoor installation to protect from weather.
4.1 Installation Conditions
Warns about condensation issues from inadequate ventilation or incorrect spacing.
4.2 Before Installation
Lists preparatory steps before assembly, such as floor leveling and element sorting.
Assembly - Floor and Mounting Frame
4.3 Level Floor
Guides on levelling the bottom ventilation panel for rooms with floor ventilation.
4.3.1 Room with Floor Ventilation
Guides on levelling the bottom ventilation panel for rooms with floor ventilation.
4.3.2 Room without Floor Ventilation
Explains how to adjust floor height using plates for uneven floors.
4.4 Assembling Mounting Frame
Safety notes on drilling, moisture barriers, dowel holes, and sealing lips during frame assembly.
Assembly - Room and Floor Elements
4.5 Assembling Room Elements
Provides instructions for connecting and assembling room elements using eccentric cam locks.
4.6 Assembling Floor Elements
Details the process of assembling floor elements, including sealant application and lock tightening.
Assembly - Apertures and Wall Elements
4.7 Seal Floor Element Apertures
Describes drilling, riveting, and sealing apertures in floor elements for insulation.
4.8 Assembling Wall Elements
Guides on assembling wall elements, emphasizing interface cleanliness for sealing.
Assembly - Partitions, Doors, and Ceilings
4.9 Assembling Partition Walls
Instructions for assembling partition walls in combination rooms without a tongue and groove system.
4.10 Mounting the Door
Steps for mounting the pre-mounted single-leaf door into the frame, ensuring alignment.
4.11 Mounting Ceiling Elements
Details how to attach and secure ceiling elements to wall elements using cam locks.
Assembly - Doorsill and Securing Plates
4.12 Seal Wall and Ceiling Element Apertures
Instructions for sealing apertures in wall/ceiling elements with foam and plugs.
DANGER! Electric Shock from Doorsill Drilling
Crucial safety warning regarding drilling into the doorsill and avoiding extra holes.
4.14 Remove Transport Securing Plates
Guides on removing securing plates from magnetic sealing frames before initial operation.
Assembly - Door Adjustments and Checks
4.15 Adjusting the Door
Comprehensive guide on adjusting door hinges for proper sealing and alignment.
4.16 Light Test
Procedure for conducting a light test to verify seal integrity in the dark room.
4.17 Attaching Cover Caps
Instructions for correctly fitting and securing cover caps onto door hinges.
4.18 Fastening the Striker
Steps for attaching and adjusting the striker for the rotary lever lock mechanism.
Electrical Connections and Mechanical Work Safety
4.19 Mechanical Work on Door or Porthole
Strict warning against mechanical work within the safety zone of doors/portholes.
4.20 Rearranging Luminaries
Instructions for repositioning internal luminaries and junction boxes.
DANGER! Electric Shock from Mains Connection
Safety advice to use qualified electricians for mains connection and protective measures.
DANGER! Electric Shock from Power Interruption Failure
Mandates shutting off mains power and securing it before making electrical connections.
Commissioning and Cleaning Procedures
6.1 Commissioning the Cold Room
Outlines the procedure for commissioning the cold room, including cleaning and temperature setting.
DANGER! Electric Shock during Cleaning
Safety directive to disconnect power before performing any cleaning operations.
Technical Sections: Decommissioning to Standards
8 Decommissioning
Instructions for safely decommissioning the unit, including power disconnection.
9 Technical Data
Table detailing permissible floor loading based on wheel contact area and type.
9.1 Permissible Floor Loading
Table detailing permissible floor loading based on wheel contact area and type.
10 Maintenance
Critical safety warning for maintenance, requiring qualified personnel and power isolation.
DANGER! Electric Shock during Maintenance
Critical safety warning for maintenance, requiring qualified personnel and power isolation.
11 Disposal
Guidance on environmentally compliant disposal of the unit according to regulations.
12 Standards and Laws
Lists applicable industry standards and legal directives for compliance.
Warranty Information
13 Warranty
Details warranty terms, period, claims process, and exclusions for product defects.
Wiring Diagram for Revolving Door
14 Wiring Diagram Revolving Door
Electrical schematic illustrating the wiring connections for a revolving door unit.
Wiring Diagram for Porthole
15 Wiring Diagram Porthole
Electrical schematic showing the wiring for a porthole, including frame heater connections.

Table of Contents