Hilti HIT-V Manual

Hilti HIT-V Manual

Injection mortar system with rod
Table of Contents

Advertisement

Quick Links

Hilti HIT-RE 500 mortar
with HIT-V / HAS rod
Hilti HIT-RE 500 mortar with HIT-V / HAS rod
Small edge
Concrete
distance
and spacing
European
CE
Technical
conformity
Approval
Approvals / certificates
Description
European technical approval a)
Fire test report
Assessment report (fire)
a) All data given in this section according ETA-04/0027, issue 2013-06-26.
556
These pages are part of the Anchor Fastening Technology Manual issue September 2014
Variable
Fire
embedment
resistance
depth
PROFIS
Anchor design
software
Authority / Laboratory
DIBt, Berlin
IBMB, Braunschweig
warringtonfire
Hilti
HIT-RE 500
330 ml foil pack
(also available
as 500 ml
and 1400 ml
foil pack)
Statik mixer
HAS rod
HAS-E rod
HIT-V rod
High
Corrosion
corrosion
resistance
resistance
Benefits
-
SAFEset
technology: drilling and
borehole cleaning in one step
with Hilti hollow drill bit
- suitable for non-cracked concrete
C 20/25 to C 50/60
- high loading capacity
- suitable for dry and water
saturated concrete
- under water application
- large diameter applications
- high corrosion resistant
- long working time at elevated
temperatures
- odourless epoxy
- embedment depth range:
from 40 ... 160 mm for M8
to 120 ... 600 mm for M30
Diamond
Hilti
SAFEset
drilled
technology with
holes
hollow drill bit
No. / date of issue
ETA-04/0027 / 2013-06-26
UB 3565 / 4595 / 2006-10-29
UB 3588 / 4825 / 2005-11-15
WF 327804/B / 2013-07-10
09 / 2014

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HIT-V and is the answer not in the manual?

Questions and answers

Summarization of Contents

Injection mortar system
Approvals / certificates
Lists product certifications and test reports for compliance.
Basic loading data
For hammer drilled holes and hollow drill bit
Provides resistance data for specific drilling methods and anchor types.
Service temperature range
Materials
Details mechanical properties of anchor components like tensile strength and yield strength.
Anchor dimensions
installation equipment
Lists necessary tools and equipment for anchor installation.
Setting instruction
Bore hole drilling
Explains methods for creating bore holes for anchor installation using different drill types.
Bore hole cleaning
Describes procedures to ensure bore holes are free of dust and debris before mortar injection.
Injection preparation
Setting the element
Guides on how to properly place the anchor element into the bore hole with mortar.
Curing time
Curing time for general conditions
Specifies time required for mortar to cure under various base material temperatures.
Setting details
Simplified design method
Outlines a simplified approach for calculating anchor design resistance considering various factors.
Tension loading
Basic design tensile resistance
Presents base tensile resistance values for different anchor sizes and types.
Shear loading
Basic design shear resistance
Provides base shear resistance values for various anchor sizes and types.
Influencing factors
Influence of concrete strength on combined pull-out and concrete cone resistance
Details how concrete strength affects combined pull-out and concrete cone resistance.
Fitness for use
Resistance to chemical substances
Lists common substances and their compatibility with the mortar system.
Electrical Conductivity
States the electrical conductivity properties of the hardened mortar.
Drilling diameters
Basic design data for rebar design
Provides bond strength data for rebar applications according to relevant standards.
Fire Resistance
a) fire situation “anchorage”
Presents fire resistance forces for rebar anchorage based on embedment depth and fire class.
b) fire situation parallel
Details fire resistance forces for parallel rebar situations based on concrete cover.
Minimum anchorage length
Minimum anchorage and lap lengths for C20/25; maximum hole lengths (ETA 08/0105)
Specifies minimum lengths for anchorage and laps based on concrete class and drilling method.

Table of Contents

Save PDF