Boiler Manual
Th is manual must only be used by a qualifi ed heating installer/service technician. Read all instructions, including this manual and all other
information shipped with the boiler, before installing. Perform steps in the order given. Failure to comply could result in severe personal injury,
death or substantial property damage.
DO NOT operate the boiler during construction
free area. Th e boiler can be severely damaged by drywall dust or other combustion air contaminants.
Models 750 - 1100
Commercial Condensing
'
• Installation
• Startup
unless combustion air is piped to the boiler air inlet from a dust-free and contaminant-
Series 1
• Maintenance
• Parts
Part number 550-100-200/1018

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SVF 1100 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Please read before proceeding
Commonwealth of Massachusetts
Specific requirements for installations in Massachusetts.
Prepare boiler location
Flooring and foundation
Requirements for the boiler's placement surface and support structure.
Garage installation
Specific precautions to take when installing the boiler in a garage environment.
Prepare boiler location (continued)
Clearance requirements
Specifies minimum distances from combustible materials and for service access.
Air openings
Details requirements for ventilation and combustion air openings.
Prepare boiler
Vent and air piping requirements
Outlines requirements for vent and air piping systems.
Prepare boiler (continued)
Uncrating the boiler
Instructions for safely removing the boiler from its shipping crate.
Moving/handling the boiler
Guidelines for safely transporting and positioning the boiler.
Prepare boiler (continued)
Placing the boiler
Steps for positioning the boiler and adjusting leveling legs.
Bolting the boiler to mounting blocks
Instructions for securing the boiler to the floor if required.
Boiler relief valve and P/T gauge
Install relief valve
Guidance on installing the pressure relief valve correctly.
Perform hydrostatic pressure test
Pressure test boiler
Procedure for performing a hydrostatic pressure test on the system.
Install water piping
Low water cutoff
Details on the factory-installed low water cutoff.
Install relief valve
Instructions for installing the pressure relief valve.
Install water piping (continued)
Recommended pipe sizing
Guidance on selecting appropriate pipe sizes for optimal flow.
Install water piping (continued)
Expansion tank and make-up water
Information on expansion tank installation and water makeup.
Install water piping (continued)
Domestic Hot Water (DHW) tank, if used
How to connect and configure DHW tanks.
System Priority choices
Explains how to set priorities for DHW and space heating.
Venting/combustion air — general
Vent and air piping materials
Lists approved materials for vent and air piping systems.
Air openings for direct exhaust
Requirements for air openings for direct exhaust ventilation.
Appliances remaining on an existing vent system
Existing vent test procedure
Procedure to test existing appliances on a common vent.
Venting/combustion air — options (Category II)
Category II Requirements
Outlines specific requirements for Category II venting.
DIRECT EXHAUST — Boiler room air openings (Category II and IV)
Sizing combustion air openings
Guidance on determining the correct size for air openings.
Required Combustion Air Damper Kit
Information on the necessity and installation of the damper kit.
DIRECT EXHAUST — Vertical (Category II and IV)
Determine termination location
Steps to identify the correct location for vertical exhaust termination.
Install vent piping
Guidance on installing the vent piping for vertical exhaust.
DIRECT EXHAUST — Sidewall (Category IV)
Determine termination location
Steps to identify the correct location for sidewall exhaust termination.
Install vent piping
Guidance on installing the vent piping for sidewall exhaust.
DIRECT VENT — Boiler room air openings (Category IV)
Sizing air openings
Guidance on determining the correct size for air openings for direct vent.
Required Combustion Air Damper Kit
Information on the necessity and installation of the damper kit for direct vent.
DIRECT VENT — Sidewall (Category IV)
Determine termination location
Steps to identify the correct location for sidewall direct vent termination.
Install vent piping
Guidance on installing the vent piping for sidewall direct vent.
DIRECT VENT — Vertical (Category IV)
Determine termination location
Steps to identify the correct location for vertical direct vent termination.
Install vent piping
Guidance on installing the vent piping for vertical direct vent.
DIRECT VENT — Vertical (continued) (Category IV)
Install vent and air terminations
Instructions for installing both vent and air terminations.
Install condensate components
Install the condensate trap
Steps for installing the condensate trap assembly.
Connect condensate line
Guidance on connecting the condensate line to a drain or pump.
Gas piping
Connecting gas supply piping
Instructions for connecting the gas supply to the boiler.
Check Natural or LP gas supply pressure
Procedure to check gas pressure for natural or LP gas.
Gas piping (continued)
Pipe sizing for Natural Gas
Guidelines for sizing gas pipes for natural gas installations.
Gas pressure switches
Information on the boiler's gas pressure switches.
Field wiring (see Figure 47 & Figure 48)
Line voltage power input
Information on connecting the main power supply to the boiler.
Required wiring connections
Essential wiring needed for boiler operation.
Field wiring (see Figure 47 & Figure 48) (continued)
A. 120 VAC Power Supply – REQUIRED
Details on connecting the main 120VAC power supply.
B. 120 VAC Outputs 1, 2 & 3 – On each boiler – As needed for systems
Information on the boiler's 120VAC outputs for system components.
Field wiring (see Figure 47 & Figure 48) (continued)
E. System supply and return temperature sensors – REQUIRED
Information on installing and wiring temperature sensors.
F. Outdoor temperature sensor – OPTIONAL
Instructions for installing an optional outdoor temperature sensor.
Field wiring (see Figure 47 & Figure 48) (continued)
G. External limits – OPTIONAL
How to connect optional external limit controls.
H. Alarm contacts – OPTIONAL
Connecting optional alarm contacts for remote notification.
Field wiring (see Figure 47 & Figure 48) (continued)
M. Multiple Boiler and BMS Connections – see ADVANCED Manual
Information on connecting multiple boilers and BMS systems.
N. Additional heat demand contacts – OPTIONAL
Connecting optional contacts for additional heat demands.
Control operation and setup
Control features
Overview of the boiler control's capabilities and functions.
Sequence of operation
Description of the boiler's operating sequence and display statuses.
Control operation and setup (continued)
Control Priorities & Input/Outputs
Explains how priorities and inputs/outputs are used for system control.
Setting Up the Boiler
Step-by-step guide for initial boiler setup and configuration.
Control operation and setup (continued)
Outdoor reset operation
How to configure outdoor reset for supply temperature control.
SUPPLY MAX
Setting the maximum supply water temperature for the system.
CONTRACTOR menus
BOILER SETTINGS
Configuration options for boiler model, altitude, fuel, etc.
PRIORITY 1
Settings for system priority 1.
PRIORITY 2
Settings for system priority 2.
BOILER SETTINGS menu, BASIC mode
BOILER MODEL
Crucial setting for correct boiler identification and operation.
CONTROL TYPE
Options for selecting single, master, or shadow boiler configuration.
HIGH ALTITUDE
Setting for altitudes above 5500 feet to adjust firing rates.
PRIORITY 1, 2, 3 menus, BASIC mode
SYSTEM TYPE
Selecting the system type to preset operating temperatures.
TARGET MOD SENSOR
Determining the primary temperature sensor for modulation.
TARGET ADJUST
How the target temperature is calculated (fixed, analog, or outdoor reset).
ASSIGN INPUTS menu, BASIC mode
INPUT 1
Assigning priority and source for input 1.
INPUT 2
Assigning priority and source for input 2.
INPUT 3
Assigning priority and source for input 3.
DIAGNOSTIC menu
TEMPERATURES
Displays current temperature readings from various sensors.
INPUTS
Shows the status and configuration of system inputs.
OUTPUTS
Displays the status of boiler outputs and auxiliary functions.
DIAGNOSTICS menu (continued)
PAST ERRORS
Accesses historical fault and lockout information.
MANUAL TEST MODE
Allows manual control of boiler functions for testing.
DIAGNOSTICS menu (continued)
Inputs
Detailed explanation of each input's function and status.
DIAGNOSTICS menu (continued)
Run Times
Tracks cumulative operating times for various boiler functions.
DIAGNOSTICS menu (continued)
Manual Test Mode
Provides details on manual testing of boiler components and functions.
MAINTENANCE, DATE AND TIME menus
MAINTENANCE INFO
Fields for entering contractor and boiler service information.
SET TIME AND DATE
Instructions for setting the system's current date and time.
Startup — fill the system
Clean system to remove sediment
Procedure for flushing the system to remove debris.
Water chemistry
Requirements for system water pH and hardness.
Fill and test water system
Steps for filling and testing the boiler and system with water.
Startup — fill the system (continued)
Purge air from water system
Steps for removing air from the hydronic system.
Check/verify water chemistry
Verifying water parameters after filling and leak testing.
Startup — final checks
Check thermostat circuit(s)
Verifying thermostat wiring and operation.
Inspect/fi ll condensate system
Checking and filling the condensate trap and lines.
Final checks before starting boiler
A checklist of critical items before initial boiler startup.
Startup procedure
To start the boiler
Step-by-step instructions for initiating boiler operation.
Check flame & combustion with instruments
Procedure for verifying flame quality and combustion parameters.
Gas valve adjustment procedure
Guidance for adjusting gas valve settings for optimal combustion.
Startup procedure (continued)
Adjust valve at high fire
Steps to adjust the gas valve for high fire combustion settings.
Adjust valve at low fire
Steps to adjust the gas valve for low fire combustion settings.
Startup procedure (continued)
Check gas input rate
Procedure to measure and verify the natural gas input rate.
Verifi cation check list
A comprehensive checklist for final startup verification.
Annual startup and maintenance schedule
Service technician
Recommended annual maintenance tasks for service technicians.
Owner maintenance
Recommended daily, monthly, and periodic maintenance for owners.
Annual startup
HANDLING CERAMIC FIBER MATERIALS
Safety precautions for handling ceramic fiber materials.
FIRST-YEAR SPECIAL INSPECTION
Requirements for the initial year inspection of the boiler.
Annual startup (continued)
Check all piping for leaks
Procedure for inspecting all piping for leaks.
Check water system
Verifying system components are installed and operational.
Annual startup (continued)
Check expansion tank
Instructions for inspecting and verifying the expansion tank.
Inspect ignition electrode / flame sense rod
Procedure for inspecting and cleaning the ignition electrode.
Annual startup (continued)
Check all boiler wiring
Inspecting all boiler wiring for condition and security.
Check burner flame
Procedure for checking and evaluating the burner flame.
Annual startup (continued)
Check flame signal
Verifying the flame signal strength and its implications.
Check flue gas temperature
Verifying flue gas temperature relative to return water temperature.
Check blower speeds
Verifying blower speeds at different firing rates.
Troubleshooting
Before troubleshooting
General precautions and tool recommendations for troubleshooting.
Troubleshooting (continued)
Check the following
Initial checks for space heating, DHW, and BMS systems.
Always check Control module fuses
Instructions for checking and replacing control module fuses.
Troubleshooting (continued)
Control fault indications
Explains how fault conditions are displayed and managed by the control.
Troubleshooting (continued)
RESET TO FACTORY DEFAULT
Procedure for resetting control settings to factory defaults.
Control Error Condition Log
How to access and interpret recorded boiler faults and errors.
Maintenance
Disconnect power before servicing
Safety warning to disconnect power before maintenance.
Clean the heat exchanger when required — water side
Procedure for cleaning the heat exchanger's water side.
Maintenance (continued)
Re-install cover plate
Instructions for reinstalling the burner/heat exchanger cover plate.
Re-install venturi/blower/mixing tube assembly
Steps to reinstall the venturi, blower, and mixing tube.
Replacement parts
Figure 91 Miscellaneous parts and kits
Lists various replacement parts and kits with part numbers.
Dimensions
Figure 98 Dimensional data — SVF 750
Provides detailed dimensions for the SVF 750 model.
Dimensions (continued)
Figure 99 Dimensional data — SVF 1000/1100
Provides detailed dimensions for the SVF 1000/1100 models.
Ratings — SVFTM Series 1 boilers
Figure 100 Ratings and engineering data
Presents AHRI certified ratings, DOE data, and specifications.
Figure 101 Derate due to vent/air piping length
Explains how vent/air piping affects boiler derating.
Installation and Service Certificate
Boiler Model Series CP Number Date Installed
Form for recording installation details and installer information.
Installation and Gas Boiler Data Collection Sheet
Boiler Settings