Grundfos UP 43-70 Installation And Operating Instructions Manual

Grundfos UP 43-70 Installation And Operating Instructions Manual

In-line, wet-rotor, single-speed, circulator pumps

Advertisement

GRUNDFOS INSTRUCTIONS
UP Series 200
Installation and operating instructions
In-line, wet-rotor, single-speed, circulator pumps
UP 43-70, UP 43-110, UP 53-45, UP 53-46

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UP 43-70 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Introduction to UP Series 200 Pumps
Safety Warnings for Installation
Highlights critical safety information regarding electric shock and proper grounding.
Electrical Work Requirements
Specifies requirements for qualified electricians and adherence to electrical codes.
Pre-Installation Checklist for UP Series 200
Confirm Correct Pump Selection
Verify pump model, nameplate data, and application suitability before installation.
Inspect Pump Condition
Examine the pump for any damage that may have occurred during shipping.
Verify Electrical Specifications
Confirm voltage, phase, and frequency match the pump motor's specifications.
Pumped Liquid Requirements
Defines the acceptable liquids and temperature ranges for pump operation.
Installation Procedures for UP Series 200
Electrical Preparation and Terminal Box
Guides on setting the terminal box position and performing necessary electrical preparations.
Piping Considerations and Mounting
Covers system flushing, pump location, and mounting positions for optimal performance.
Connecting the Pump to the System
Details the process of installing the pump into the piping system.
Electrical Connection Guide
Explains how to safely connect the pump to the power supply, including dual-voltage setup.
Starting the UP Series 200 Pump
Venting the Piping System
Describes the procedure for removing trapped air from the system before operation.
Selecting the Correct Voltage
Details how to select the correct voltage for the pump's operation.
Troubleshooting UP Series 200 Pumps
Fault Finding Chart
Provides a systematic guide to diagnose and resolve common pump faults and issues.
Preliminary Checks Before Troubleshooting
Covers essential checks like supply voltage and motor connections before troubleshooting.
Current Measurement and Analysis
Explains how to measure current draw and evaluate motor overload conditions.
Insulation Resistance (Lead-to-Ground)
Details testing motor insulation resistance to ground for safety and performance.
Winding Resistance (Line-to-Line)
Describes how to measure winding resistance between motor terminals.
Winding Resistance Chart
Lists expected winding resistance values for different pump models and voltages.
Replacing Components on UP Series 200
Removing the Pump Head
Step-by-step instructions for safely removing the pump head assembly.
Fitting the Replacement Pump Head
Guidance on correctly installing a new pump head, including impeller and bearing.
Replacing Terminal Box or Capacitor
Instructions for replacing the terminal box or capacitor, ensuring proper connections.

Table of Contents