Master BF 75 Operation And Maintenance Manual

Master BF 75 Operation And Maintenance Manual

Hot air generator

Advertisement

GB – Hot air generator
Operation and maintenance manual
BF 35
BF 35
BF 35
BF 35
4111.805
BF 45
BF 45
BF 45
BF 45
Edition 10
Rev. 01
BF 75
BF 75
BF 75
BF 75
BF 95
BF 95
BF 95
BF 95
BF 105
BF 105
BF 105
BF 105

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BF 75 and is the answer not in the manual?

Questions and answers

Summarization of Contents

INSTALLATION
ELECTRIC CONNECTIONS AND SETTINGS
Main heater electricity supply, grounding, switchboard, and disconnect switch.
HOT AIR DUCTS CONNECTION
Connecting air ducts, air output variation due to diameter, length, and bends.
CHIMNEY AND CHIMNEY FLUE CONNECTION
Efficient smoke evacuation, pipe length, bends, diameter, and chimney draught.
WASTE PRODUCTS ANALYSIS
Checking combustion waste products and smoke temperature using probes.
OPERATION
SWITCHING ON AND OFF
Procedures for starting and safely stopping the heater, including fan cooling.
VENTILATION MODE
Operation of the heater in continuous fan mode.
MAINTENANCE
HEAT EXCHANGER AND COMBUSTION CHAMBER CLEANSING
Cleaning heat exchanger and combustion chamber due to soot formation and prolonged use.
FAN AND BURNER CLEANSING
Cleaning aspiration grate and fan blades; burner servicing by authorized technician.

Table of Contents