Advertisement

Installation Instructions for Kāinga Ora Builds
INDEX
Tray & Liner Introduction
Tray/Liner Install & Bonding
Shower Introduction
2-Sided Shower Install
3-Sided Shower Install
Important
1124
INSTRUCTION MANUAL
Adina
1. When you receive your shower package, please check
for any freight damage.
2. If damage has occurred, advise your supplier within 8
hours.
3. Do not install any faulty product as this will invalidate
later claims.
2-Sided & 3-Sided
PAGE
2
3 to 6
7
8 to 13
14 to 18

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Adina and is the answer not in the manual?

Questions and answers

Summary of Contents for NewLine Adina

  • Page 1 INSTRUCTION MANUAL Adina 2-Sided & 3-Sided Installation Instructions for Kāinga Ora Builds INDEX PAGE Tray & Liner Introduction Tray/Liner Install & Bonding 3 to 6 Shower Introduction 2-Sided Shower Install 8 to 13 3-Sided Shower Install 14 to 18 1. When you receive your shower package, please check for any freight damage.
  • Page 2 Working with Acrylic Materials: Cutting of Liner: Drilling: Cutting of Liner: NEWLINE RECOMMENDS A SKILLED TRADESMAN ACQUAINTED WITH SHOWER INSTALLATIONS TO ENSURE THE VERY BEST OUTCOME. NEWLINE RECOMMENDS A SKILLED TRADESMAN ACQUAINTED WITH SHOWER INSTALLATIONS TO ENSURE THE VERY BEST OUTCOME.
  • Page 3 PREPARATION CHECKLIST PREPARATION CHECKLIST The builder is responsible for these steps to enable a successful shower installation. The Floor: Wall Framing The Wall Board Plumbing: IMPORTANT INFORMATION IMPORTANT INFORMATION WALLBOARD LINING OF SHOWER WALLS Two-Sided: Three-Sided Alcove:...
  • Page 4: Installation

    Table 1. Wallboard Acrylic Wall Liner Walls must be plumb, straight Support with 90degree corners as errors Batten can duplicate not allowing the AquaCheck Seal Bottom Plate Newline Tray Wallboard to Wallboard Gib Lining to Lining Frame to Frame...
  • Page 5 INSTALLATION Have you done the Page 3 checklist? INSTALLATION STEP 1 • • Diagram C Tray upstand Aquacheck seal End Block Note: STEP 2 Glue the tray down with Tray Adhesive at the rings underneath. Apply a small seal of silicone underneath •...
  • Page 6 INSTALLATION Bonding + Sealing Lines INSTALLATION Bonding + Sealing Lines STEP 3: Wall Liner Installation Marking Out plumbing cutouts. Gib Centre Seal top edge of liner with a paint Liner hole Diagram E compatible sealant. same size as Caddy and Gib This horizontal glue Silicone seal hole edge line 20mm above Tray...
  • Page 7: Before You Start

    The Installers Responsibility: All compliance with all council regulations. • Tools Required WARRANTY This covers faulty goods but not breakages. Visit newline.nz for information. • Compliance with Specs and these instructions are essential for a valid warranty. • NEWLINE RECOMMENDS A SKILLED TRADESMAN ACQUAINTED WITH...
  • Page 8 PROCESS 2-Sided Before commencing installation, please ensure you have the following components in your package to complete installation. TICK DESCRIPTION PART NO. Wall Channels Fixed Return Panel Door Front Assembly Handle Set Fixed Panel Screws 4 x 10mm Fixed Panel Screw Caps Screw Pack Wall Jamb Fixing Screws 3.5 x 35mm Wall Plug (Concrete)
  • Page 9 PROCESS Layout Plan A: 2-Sided WALL WALL CHANNEL CHANNEL 20mm IMPORTANT: INSTALLATION STEPS: PAGE 10 TO 13 MINIMUM AND MAXIMUM TABLE Wall out of plumb will not allow the full minimum / maximum range. SHOWER TYPE DOOR SET MIN/MAX RETURN PANEL MIN/MAX 820 x 820 776 - 793 786 - 803...
  • Page 10 PROCESS 2-Sided Instructions 20mm 20mm 20mm 770-788 mm 820-838 mm 870-888 mm 770-788 mm 770-788 mm 820-838 mm 820-838 mm 870-888 mm 870-888 mm 770-788 mm 820-838 mm 870-888 mm 770-788 mm 770-788 mm 820-838 mm 870-888 mm 820-838 mm 870-888 mm...
  • Page 11 PROCESS 2-Sided Instructions From marks, From marks, predrill a 2mm predrill a 2mm hole in liner. hole in liner. Apply continuous bead of silicone to the rear face of the wall channel before placing against the liner Fit Screw Caps.
  • Page 12 PROCESS 2-Sided Instructions 3 of 4 1 of 2...
  • Page 13 PROCESS 2-Sided Instructions Seal the join between wall channel and frame. 150mm up from base on both sides...
  • Page 14: Assembly Diagram

    Screw Pack The information contained within this drawing is the sole APPVROVED: property of Newline Group Ltd. It must not be distributed or sent to any third parties without prior written permission. 19/05/2022 Wall Jamb Fixing Screws 3.5 x 35mm DATE: Copyright 2017 ©...
  • Page 15 LAYOUT PLAN A 3-Sided 13mm IMPORTANT: INSTALLATION STEPS: PAGE 16 TO 18 MINIMUM AND MAXIMUM TABLE Wall out of plumb will not allow the full minimum / maximum range. SHOWER TYPE DOOR SET MIN/MAX 810 (3-Sided) 780 - 811 900 (3-Sided) 867 - 898 1000 (3-Sided) 970 -1001...
  • Page 16 PROCESS 3-Sided Instructions 13mm Mark wall channel holes and pre-drill 2mm holes in Acrylic Liner wall wall wall 13mm 13mm wall wall wall wall wall wall...
  • Page 17 PROCESS 3-Sided Instructions With assistance, enter the Door Set with Wall Channels each side to pre- drilled holes. Apply continuous bead of silicone STEP 2: ROTATE DOOR Apply silicone to TO LINE UP WITH MARKS to the rear join as indicated. face of the wall Start some screws channel before...
  • Page 18 PROCESS 3-Sided Instructions 150MM HIGH Seal the join up from base on both sides. CONTACT 54 Unutoto Place, Tauriko, Tauranga, 3171 Freephone: Phone: Email: newline.nz...

Table of Contents