EVM User's Guide: J7EXPA01EVM
J7EXPA01EVM Evaluation Module
Description
The J7EXPA01EVM add-on board is designed to
expand the capability of Jacinto7 EVMs to include
video capture capabilities. This hardware system can
help kick start the development and evaluation of
the Jacinto7 family of processors in many different
automotive and industrial applications.
The J7EXPA01EVM provides the ability to interface
with external camera sensors, radar sensors,
and other similar capture devices through Texas
Instruments FPD-Link serial links. The EVM
can support up to twelve different inputs, and
communicates with the processor through multiple
MIPI D-PHY CSI2 interfaces.
Get Started
1. Order the EVM at J7EXPA01EVM.
2. Download the EVM
design
3. Read this user's guide.
4. Download all related information for the base and
host EVM for which this board is mounted. See
EVM Compatibility
for supported EVMs.
SPRUJ97 – JUNE 2024
Submit Document Feedback
files.
J7EXPA01EVM
Copyright © 2024 Texas Instruments Incorporated
Features
Designed to work with Jacinto7 Processor EVMs
Multiple capture inputs using Texas Instruments
FPD-Link IV devices
Supports up to 12 high speed image/data input
ports simultaneously
Each input can support 8MP+ imagers with
8.4Gbps line rates
Supports variety of different sensors including
image and radar modules
Applications
Automotive
and
Industrial
Automotive front camera systems
Automotive surround view
systems
Industrial HMI
Robot teach pendant
J7EXPA01EVM Evaluation Module
Description
and
park assistance
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the J7EXPA01EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments J7EXPA01EVM

  • Page 1 Description EVM User's Guide: J7EXPA01EVM J7EXPA01EVM Evaluation Module Description Features The J7EXPA01EVM add-on board is designed to • Designed to work with Jacinto7 Processor EVMs expand the capability of Jacinto7 EVMs to include • Multiple capture inputs using Texas Instruments video capture capabilities.
  • Page 2: Kit Contents

    1 Evaluation Module Overview 1.1 Introduction The J7EXPA01EVM is an expansion and add-on module and does not operate stand-alone. The EVM is designed to be matched with Jacinto7 Processor EVMs, including J721EXCPXEVM and J784S4XEVM. Other hardware configurations can be supported but are not covered in this document. This design is not a reference design, as the design includes circuitry for software development, debug, and flexible configurations.
  • Page 3: Device Information

    2 Hardware 2.1 Key Features and Interfaces The J7EXPA01EVM is a add-on module that expands the feature set of select TI processor evaluation modules (EVMs) to include advanced video capture features. The combined EVM design provides users the ability to evaluate and develop automotive and industrial applications that utilize advanced video and image processing.
  • Page 4 Figure 2-2. Key Features and Interfaces (Bottom) 2.2 EVM Compatibility The J7EXPA01EVM is not a stand-alone EVM but is an add-on or expansion board that must be combined with a base EVM. Table 2-1 includes several Texas Instruments EVMs that can support the J7EXPA01EVM. This list is not meant to be all inclusive and the J7EXPA01EVM can be supported with other EVM systems.
  • Page 5 The base EVM does provide power to the J7EXPA01EVM add-on module and is sufficient to cover basic power needs. If the attached sensors require have more substantial power requirements, then users have to supplement the EVM and, specifically, the J7EXPA01EVM requires additional power input.
  • Page 6 Power_3V3 Power, 3.3V Input CSI_1_D1_N CSI Port 1 Data Lane 1 Output Power_3V3 Power, 3.3V Input CSI_1_D2_P CSI Port 1 data lane 2 Output J7EXPA01EVM Evaluation Module SPRUJ97 – JUNE 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 7 Power, 3.3V Input Open / Unused Power_3V3 Power, 3.3V Input Open / Unused Power_IO Power, IO voltage level (1.8V or 3.3V) Input Open / Unused SPRUJ97 – JUNE 2024 J7EXPA01EVM Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 8: Circuit Details

    CSI0_RX CSI2_RX I2C5 J784S4XEVM CSI0_RX CSI1_RX Note Some processor EVMs require a common base board (J721EXCPXEVM) to operate. This includes the J721EXSOMXEVM and J721S2XSOMXEVM. J7EXPA01EVM Evaluation Module SPRUJ97 – JUNE 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 9 Hardware 2.6.2 I2C Address Map Table 2-5 provides the complete I2C address mapping details for the J7EXPA01EVM add-on module. Please see the table below for details on which I2C is connected based on the base EVM. Table 2-5. I2C Mapping...
  • Page 10 PROC082E1A: Pre-Production, version '1A'. PROC082E3: Pre-Production, version '3'. PROC082A: Production Version 'A'. See schematic history/change log for complete list of changes for each version. J7EXPA01EVM Evaluation Module SPRUJ97 – JUNE 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 11: Compliance Information

    5.1 Known Hardware or Software Issues There are no known issues with the EVM. 5.2 Trademarks All trademarks are the property of their respective owners. SPRUJ97 – JUNE 2024 J7EXPA01EVM Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 12: Related Documentation

    Related Documentation www.ti.com 6 Related Documentation UB9702 Programming Manual: contact your TI representative to access this document. J7EXPA01EVM Evaluation Module SPRUJ97 – JUNE 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 13 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 14 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 15 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 16 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 17 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 18: Important Notice

    TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2024, Texas Instruments Incorporated...

Table of Contents