Page 1
INSTALLATION AND OPERATING INSTRUCTIONS CM Series ISO2858 Heavy Duty Industrial Centrifugal Pump Please pass these instructions on to the operator of this equipment.
Introduction Foundations Thank you for purchasing a quality Davey product. It is The pump unit should be mounted on a foundation that our commitment to satisfy our customers by offering our is substantial enough to withstand the weight of the unit very best service.
Electrical Connection Trouble Shooting Pump is running but failing to deliver water or WARNING: When installing, servicing or desired pressure. attending pump, always ensure power is switched off and lead unplugged. Electrical Turn the unit off. connections should be serviced only by Check suction line is free of debris or blockages qualified persons.
2 pole 4 pole 6 pole 8 pole D.O.L. For operation in conditions other than that above please contact Davey. D.O.L. D.O.L. Electric motor starting imposes severe thermal stress on D.O.L. the motor, the frequency of starting should be minimized to ensure optimum machine life.
MOTOR OPERATION AND MAINTENANCE Maintenance Instructions E. On a six (6) monthly basis, in addition to the items in ‘D’ :- The following maintenance instructions apply to all SGA Check stator resistance (compare to original and motors except for hazardous location motors. For enter in log book) SGAE, SGAN and SGAD motors maintenance must ii) Check supply voltage at motor terminals.
Customer Service line on 1300 367 866 in Australia, or 0800 654 333 in New Zealand, or send a written letter to Davey at the address listed below. On receipt of your claim, Davey will seek to resolve your difficulties or, if the product is faulty or defective, advise you on how to have your Davey product repaired, obtain a replacement or a refund.
Need help?
Do you have a question about the ISOspec CM Series and is the answer not in the manual?
Questions and answers