Download Print this page

Advertisement

Quick Links

Dell PowerSwitch S5200F-ON Series
Setup Guide
July 2023
Rev. A04

Advertisement

loading
Need help?

Need help?

Do you have a question about the PowerSwitch S5200F-ON Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Dell PowerSwitch S5200F-ON Series

  • Page 1 Dell PowerSwitch S5200F-ON Series Setup Guide July 2023 Rev. A04...
  • Page 2 A WARNING indicates a potential for property damage, personal injury, or death. © 2019 - 2023 Dell Inc. or its subsidiaries. All rights reserved. Dell Technologies, Dell, and other trademarks are trademarks of Dell Inc. or its subsidiaries. Other trademarks may be trademarks of their respective owners.
  • Page 3 Four-post rack mount..............................20 DC power connections..............................21 S5212F-ON only DC power connections........................23 Optics installation................................24 Optics removal................................24 Switch start up.................................. 24 After switch installation..............................24 Chapter 4: Specifications......................25 Chassis physical design..............................25 Chapter 5: Dell support....................... 28 Contents...
  • Page 4 ● Delll PowerSwitch S5200F-ON Series Installation Guide ● Delll PowerSwitch S5200F-ON Series Release Notes ● Delll PowerSwitch S5200-ON Series BMC User Guide ● Open Networking Hardware Diagnostic Guide NOTE: For the most recent documentation, see the support site: https://www.dell.com/support. About this guide...
  • Page 5 Information symbols This book uses the following information symbols: NOTE: The Note icon signals important operational information. CAUTION: The Caution icon signals information about situations that could result in equipment damage or loss of data. NOTE: The Warning icon signals information about hardware handling that could result in injury. NOTE: The ESD Warning icon requires that you take electrostatic precautions when handling the device.
  • Page 6 Site preparations The 5200F-ON Series (S5232F-ON, S5248F-ON, S5296F-ON, S5224F-ON, and S5212F-ON) switch is suitable for installation as part of a common bond network (CBN). You can install the switch in: ● Network telecommunication facilities ● Data centers ● Other locations where the National Electric Code (NEC) applies. For more information about the S5200F-ON Series switch specifications, see Specifications.
  • Page 7 Dell Technologies recommends grounding your switch. Use the S5200F-ON Series switch in a CBN. NOTE: For an AC-powered switch, although the third conductor of the AC power cable provides a ground path, Dell Technologies recommends grounding your switch with a dedicated ground wire. You can order an AC ground lug separately.
  • Page 8 Storing components If you do not install your S5200F-ON Series switch and components immediately, properly store the switch and all components following these guidelines: ● Storage location temperature must remain constant. The storage range is from -40° to 70°C (-40° to 158°F). ●...
  • Page 9 S5200F-ON Series switch Installation To install the S5200F-ON Series (S5232F-ON, S5248F-ON, S5296F-ON, S5224F-ON, and S5212F-ON) switch, complete the installation procedures in the order that is presented. Always handle the switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs). NOTE: ESD damage can occur if components are mishandled.
  • Page 10 To attach a ground cable to the switch, use the included M4 screws. NOTE: For an AC-powered switch, although the third conductor of the AC power cable provides a ground path, Dell Technologies recommends grounding your switch with a dedicated ground wire. You can order an AC ground lug separately.
  • Page 11 ● Reduced airflow—Do not compromise the amount of airflow that is needed for safe operation of the equipment. Install the equipment in the rack so that the equipment constantly has the correct amount of airflow surrounding it. ● Reliable earthing—Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than the direct connections to the branch circuit, for example: Use of power strips.
  • Page 12 Figure 4. Attach the dual-tray front to the four-post rack front 7. Attach the rear dual-tray switch rails to the four-post rack from the rear. Secure the dual tray to the rack using two user-supplied screws for each rack post. Figure 5.
  • Page 13 Figure 7. Install one-half U switch The switch is fully inserted when it presses the stop feature on the dual tray. The front switch latch snaps the switch into place. Figure 8. Dual-tray stop feature 2. Insert the second switch in the open dual-tray slot if you are installing two switches. One-half U switch removal Remove the S5212F-ON switch from the dual tray from the front of the four-post rack.
  • Page 14 Figure 10. Switch release arrow One U ReadyRails installation For the S5248F-ON, S5232F-ON, and S5224F-ON switches, you can install the ReadyRails system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole methods. The tooled installation methods include two-post flush mount, two-post center mount, or four-post threaded mount.
  • Page 15 1U Tool-less mount installation NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1. Face the ReadyRails flange ears facing outward. Place one rail between the left and right vertical posts. Align and seat the back flange rail pegs in the back vertical post flange.
  • Page 16 Figure 13. Two-post flush-mount installation 2. Attach one rail to the front post flange with two user-supplied screws, item 2. 3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied screws, item 3.
  • Page 17 Figure 14. Two-post center-mount installation 2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3.  3. Repeat this procedure for the second rail. Four-post threaded installation NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1.
  • Page 18 Figure 15. Four-post threaded installation 2. For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end. S5200F-ON Series switch installation For the 1U two-post configurations for the S5248F-ON, S5232F-ON, and S5224F-ON switches, slide the switch into the rails in the same manner as the four-post configurations.
  • Page 19 Figure 16. Switch rail attachment 2. After you install both rails, line them up on the ReadyRails. Slide the switch in until it is flush with the front of rack. About three inches before you fully insert your switch, the rail locking feature engages to keep the switch from inadvertently sliding out and falling.
  • Page 20 NOTE: Do not the use the mounted Ready-Rails as a shelf or a workplace. 3. Tighten the two thumb screws and rack screws. To remove the chassis from the rack or cabinet, press in the two side-release bars on the chassis at the same time and slide the chassis forward.
  • Page 21 Figure 18. S5296F-ON installation 1. Extra screws to restrict front-back movement of the switch. 2. Main screw DC power connections NOTE: Use the following instructions for all S5200F-ON Series switches except for the S5212F-ON switch. To connect DC power to the S5212F-ON switch, see S5212F-ON only DC power connections.
  • Page 22 Figure 19. DC Power Connector and Wiring Block 1. DC wire RTN 2. DC power connector 3. Captive screws (2) 4. Orange tab 5. PSU status LED 6. DC power socket 7. DC wire –48V Figure 20. DC Power Connector Ground 1.
  • Page 23 NOTE: Never try to force the power connector into or out of the DC PSU power socket. NOTE: To remove the power connector from a DC PSU, squeeze the levers on both sides of the connector. Doing so disengages the power connector’s clamps. While continuing to squeeze, pull the power connector from the DC PSU socket. S5212F-ON only DC power connections NOTE: Use the following instructions for the S5212F-ON switch only.
  • Page 24 After switch installation After you have securely installed and powered on the S5200F-ON Series switch: ● If you are using Dell software, see switch documentation at https://www.dell.com/support. ● If you are using third-party software, see ONIE documentation at https://opencomputeproject.github.io/onie/. S5200F-ON Series switch Installation...
  • Page 25 Specifications This section lists the S5200F-ON Series switch specifications. CAUTION: Operate the product at an ambient temperature not higher than 45°C (113°F). CAUTION: Lithium Battery Caution: There is a danger of explosion if the battery is incorrectly replaced. Replace only with same or equivalent type of battery. Dispose of the batteries according to the manufacturer's instructions.
  • Page 26 S5212F-ON: 304W = 1037 BTU/Hr Maximum operational altitude 10,000 feet (3,048 meters) Maximum non-operational altitude 39,370 feet (12,000 meters) Shock Dell Spec SV0115 Table 3. AC power requirements  Parameter Specifications Power supply S5232F-ON: 100–240 VAC 50/60 Hz S5248F-ON: 100–240 VAC 50/60 Hz S5296F-ON: 100–240 VAC 50/60 Hz...
  • Page 27 Table 3. AC power requirements (continued) Parameter Specifications S5224F-ON: 280W typical S5212F-ON: 208W typical Table 4. DC power requirements  Parameter Specifications Minimum and maximum input voltage range –40VDC minimum Maximum current at full load with fan S5232F-ON: 15.9A @40VDC S5248F-ON: 16.2A @40VDC S5296F-ON: 22.3A @40VDC S5224F-ON: 11.4A@40VDC S5212F-ON: 7.6A@40VDC...
  • Page 28 Dell support The Dell support site provides documents and tools to help you use Dell equipment and mitigate network outages. Through the support site you can obtain technical information, access software upgrades and patches, download available management software, and manage your open cases. The Dell support site provides integrated, secure access to these services.