  • Page 1 Installation Guide For DC Electric Thruster Models SE80, SE100, SE120, SE130, SE150 DOCUMENT ID: 2687 REVISION: DATE: 2025 LANGUAGE:...
  • Page 2: Table Of Contents

    Indicate a potentially hazardous situation that, if not avoided, could result in death or severe injury. CAUTION Indicates a potentially hazardous situation that could result in minor or moderate injury or critical damage to vessel integrity if not avoided. MC_0020 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 3: Responsibility Of The Installer

    If local regulation requires any electrical work to be performed by a licensed professional, seek a licensed professional. • When planning the installation of Sleipner products, ensure easy access to the products for future service and inspection requirements. For Sleipner thruster systems: MC_0425 •...
  • Page 4: Product Dimensions

    Minimum tunnel wall thickness 0,28 T (max) Maximum tunnel wall thickness 0,35 *Valid for SE & SEP The propellers must never extend out of the tunnel. Tunnel centre line MG_0075 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 5: Product Specifications

    150 kg / 330 lbs (21V) 8.8 kW / 11.8 hp 38 kg / 79 lbs * SE and SE-IP are measured at motor terminals when the thruster is operated for on/off thrusters SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 6: Positioning Of The Tunnel / Thruster

    (NB: This can be overlooked depending on the installation methods defi ned in this manual.) Pivot point important Lowered rotation power performance Stronger rotation power performance Water line Ø min 1/4 Ø (Recommended) min 1/4 Ø (Recommended) MG_0001 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 7: Tunnel Length

    Increase tunnel length to protect never extend out of the tunnel cavity between the propeller and the propeller from water forces the hull of the boat. when high-speed cruising. MG_0048 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 8: Tunnel Installation In Sailboats

    This can also be an installation method for flat bottomed barges to avoid extremely long tunnels and large oval tunnel openings in the hull.   Pos. A Pos. B MG_0004 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 9: Water Deflection

    In the event when the boat is traveling at high speeds it will commonly pound upon the water surface. High water force while underway from wave contact MG_0003 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 10: Tunnel Ends

    This “free” extra thrust in optimal installations be 30 - 40% of the total thrust. (NB: A Sleipner thruster propeller does not produce cavitation at working speed. Therefore, any cavitation and cavitation noise in the tunnel will be caused during improper tunnel installation.)
  • Page 11: Tunnel Installation

    fi breglass, a resin/ fi breglass mixture must be used in that area.) 8 x layers of fiberglass and resin 8 x layers of fiberglass and resin MG_0005 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 12 You must apply gel coat to areas you have grounded/ moulded to make waterproof. These areas allow water access to the hull which is typically not waterproof without these applications outside. (NB: All original Sleipner tunnels are fully waterproof when delivered except in the areas where you have cut and bonded it to the hull.)
  • Page 13: Stern Tunnel Installation

    Stern Tunnel Installation MC_0003 For Stern Thruster installation please refer to the supplied manual in your Sleipner product delivery Installation Guide For DC Electric Thruster Models SE80, SE100, SE120, SE130, SE150 Stern Thruster SLEIPNER AS DOCUMENT ID: 222222 REVISION: P.O. Box 519...
  • Page 14: Gear Leg & Motor Bracket Installation

    PORT STARBOARD E250/300TC E300/300TC E340/300 SH300/300TC SH320/300TC SAC320/300TC SH360/300TC SH400/300TC Bolt plate SAC360/300TC SAC400/300TC SH420/386TC SH550/386TC SH360/300TC SH700/412 SAC450/386TC SAC520/386TC SAC700/412 Drill centre hole first Smooth surface area MG_0055 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 15 Place top motor bracket and bolt plate to measure the drive shaft has come through the motor bracket at the correct height. Remove the gear leg and propeller for fi nal installation. Gasket Test the propeller turns without Gear leg obstruction with tunnel wall Motor bracket MG_0618 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 16 Apply MS Polymer sealant or equal to both sides of the gasket. Do not apply sealant to the bolt holes. Motor bracket /215mm Tunnel Diameter /185mm /250mm Nm lb/ft mm inch Fasten 13,3 MG_0619 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 17: Propeller Installation

    Propeller Lock Nut Washer FASTEN 20 Nm 14.75 lb/ft Anti-fouling Anode Apply Loctite 243 or similar Anode Holding Screw MG_0033 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 18: Motor Installation

    > 30° Do not position support on the motor cap. Motor FASTEN (33 Nm) (24 lb/ft) Motor support MG_0043 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 19: Electrical Installation

    Wiring Diagram chapter for an overview. Sleipner offers both manual main switches and Automatic Main Switches (AMS). Sleipner AMS is controlled by the control panel in addition to the option of manual operation. Turning on the control panel also turn on the automatic main switch. When the control panel is turned off the automatic main switch is turned off.
  • Page 20: Electrical Reference Guide

    2 x 120 150/215T 610 A SAE: 1064 ANL 500 EN: 940 2 x 2/0 2 x 3/0 2 x 3/0 2 x 4/0 2 x 4/0 2 x 4/0 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 21: Manual Main Switch Wiring Diagram 12V Thruster

    The top and bottom wiring diagram is for a dual thruster system, for example a bow and stern installation. 4-wire cable Thruster Fuse 10A ANL Fuse Manual Main Switch BATTERY MG_0590 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 22: Automatic Main Switch Wiring Diagram 12V Thruster

    The top and bottom wiring diagram is for a dual thruster system, for example a bow and stern installation. Fuse 10A Automatic Main Switch 5-wire cable Thruster ANL Fuse 4-wire cable BATTERY Fuse 5A MG_0567 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 23: Manual Main Switch Wiring Diagram 24V Thruster

    The top and bottom wiring diagram is for a dual thruster system, for example a bow and stern installation. 4-wire cable ANL Fuse Thruster Manual Main Switch Fuse BATTERY BATTERY MG_0591 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 24: Automatic Main Switch Wiring Diagram 24V Thruster

    The top and bottom wiring diagram is for a dual thruster system, for example a bow and stern installation. Automatic Main Switch Fuse 5-wire cable Thruster ANL Fuse BATTERY Fuse 5A 4-wire cable BATTERY MG_0578 SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 25: Control Panel Installation

    For Control Panel installation please refer to the Installation Guide accompanying the control panel to be installed. Installation Guide Control Panel SLEIPNER MOTOR AS DOCUMENT ID: REVISION: P.O. Box 519 N-1612 Fredrikstad DATE: Norway www.sleipnergroup.com LANGUAGE: SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 26: Post Installation Checklist

    The compartment for the thruster has been isolated from general bilge water and has no obvious or suspected risks for flooding: .................................................................................................................................. Other comments by installer: ........................................................................................................................SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 27: Sleipner Group Waste Disposal And Recycling Guide

    Introduction: At Sleipner Group, we prioritize sustainability and encourage the repair and re-manufacturing of products to extend their life cycles. If disposal is necessary, please follow these guidelines to recycle and manage waste responsibly, ensuring our efforts align with environmental protection efforts.
  • Page 28: Service And Support

    11. This warranty gives you specific legal rights, and you may also have other rights which vary from country to country. Patents MC_0024 At Sleipner we continually reinvest to develop and offer the latest technology in marine advancements. To see the many unique designs we have patented, visit our website www.sleipnergroup.com/patents SE80 & SE100 & SE120 & SE130 & SE150...
  • Page 29 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 30 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 31 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SE80 & SE100 & SE120 & SE130 & SE150 2687 2025...
  • Page 32 © Sleipner Motor AS, All rights reserved The information given in the document was right at the time it was published. However, Sleipner Motor AS cannot accept liability for any inaccuracies or omissions it may contain. Continuous product improvement may change the product specifi cations without notice.

This manual is also suitable for:

Se80Se120Se130Se150