Installation Guide
For Ignition Protected DC Electric Thruster Models
SE-IP100, SE-IP130
DOCUMENT ID:
2653
REVISION:
11
DATE:
2021
EN
LANGUAGE:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SE-IP100 and is the answer not in the manual?

Questions and answers

Summary of Contents for Sleipner SE-IP100

  • Page 1 Installation Guide For Ignition Protected DC Electric Thruster Models SE-IP100, SE-IP130 DOCUMENT ID: SLEIPNER AS 2653 REVISION: P.O. Box 519 DATE: N-1612 Fredrikstad 2021 Norway LANGUAGE: www.sleipnergroup.com...
  • Page 2: Table Of Contents

    SE100/185T-24IP - SE100 Tunnel thruster, 24V-IP SE100/185T-12IP - SE100 Tunnel thruster, 12V-IP SE130/250T-24IP - SE130 Tunnel thruster, 24V-IP SE130/250T-12IP - SE130 Tunnel thruster, 12V-IP Sleipner Motor AS P.O. Box 519, Arne Svendsensgt. 6-8 N-1612 Fredrikstad, Norway MC_0020 SE IP 100 & SE IP 130...
  • Page 3: Responsibility Of The Installer

    Sleipner products. The recommendations given in this document are guidelines ONLY, and Sleipner strongly recommends that advice is obtained from a person familiar with the particular vessel and applicable regulations.
  • Page 4: Thruster Measurements

    Thruster Measurements MC_0132 * IP 100 * IP 100 * IP 130 * IP 130 Measurement Measurement description code mm inch mm inch mm inch mm inch Internal tunnel diameter 7,28 7,28 9,84 9,84 Motor Height 19,65 20,08 20,12 20,12 Width 12,05 12,05...
  • Page 5: Thruster Specifications

    - The electric thermal cut-off switch in electro motor protects against overheating (auto-reset when electro motor cools down). - Flexible coupling between electro-motor and drive shaft protects electro motor and gear system if propeller jams. - Original Sleipner panels shut off automatically 6 minutes after last use. - Original Sleipner panels use child-safe double ON buttons.
  • Page 6: Positioning Of The Tunnel / Thruster

    Positioning of the tunnel / thruster MC_0003 Aim to install the thruster as far forward as possible (1) Due to the leverage effect around the boats’ pivot point. The distance difference from the boat pivots’ point to the thruster will determine the amount of real rotation power for the boat.
  • Page 7: Tunnel Length

    Tunnel Length MC_0003 Optimal tunnel length Achieving the correct tunnel length depends on many factors from the hull type, operation and environmental conditions. Tunnels should avoid being longer than 4 x the tunnel diameter as this will reduce thruster performance. (NB: Installing long length tunnels can flex/ bend over time and may require additional support.
  • Page 8: Tunnel Installation In Sailboats

    Tunnel installation in Sailboats MC_0003 Some sail boats have a flat bottom and shallow draft in the bow section. This can make installing the thruster as far forward from the boats main pivot point diffi cult. (Fig. 1). However, it is possible to install a tunnel thruster in most sail boats, even when the hull does not directly support the fi tting of a tunnel. Instead fi...
  • Page 9: Water Deflection

    Water Deflection MC_0003 A possible problem in sail boats or fast powerboats is that a non-rounded surface can generate drag from the back face of the tunnel, as it creates a “flat” area facing the flow of water. This problem can be solved in two different ways, depending on what is possible or easier to perform. The best solution which generally reduces the most drag is to make a recess in the hull at the back of the tunnel.
  • Page 10: Tunnel Ends

    Tunnel Ends MC_0003 Rounded tunnel ends will maximise thrust and minimise noise and cavitation. For best performance round the tunnel connection to the hull-side as much as possible. The minimum rounding has a radius of 10% of the diameter of the tunnel.
  • Page 11: Tunnel Installation

    Tunnel Installation MC_0003 IMPORTANT We recommend that a professional does the fi breglass, steel or aluminium fi tting of the tunnel. These instructions are only general instructions and do not explain in any way the details of fi breglass work. Problems caused by faulty installation of the tunnel, are the installers full responsibility.
  • Page 12 Tunnel Installation MC_0003 With tunnel installed and cast. Round the edges with a radius of 10% of the tunnel diameter. For steel/ aluminium hulls make a slope with a length of 10-15% of the tunnel diameter. (NB: If this is not possible, round the tunnel end as much as possible.) Additionally cast two layers on the outside of the tunnel/ hull in a 10cm area Follow the same method if making the deflector/ spoiler.
  • Page 13: Stern Tunnel Installation

    Stern Tunnel Installation MC_0003 For Stern Thruster installation please refer to the supplied manual in your Sleipner product delivery Installation Guide Stern Thruster SLEIPNER AS DOCUMENT ID: P.O. Box 519 REVISION: DATE: N-1612 Fredrikstad Norway www.sleipnergroup.com LANGUAGE: SE IP 100 & SE IP 130...
  • Page 14: Gear Leg & Motor Bracket Installation

    Gear Leg & Motor Bracket Installation MC_0001 ! Please refer to the graphic for special considerations relating to your model ! Mark the tunnel centreline and the boat’s centreline. (NB: Install the gear leg and propeller as shown above for the thrust direction to correspond with the control panel.
  • Page 15: Propeller Installation

    Propeller Installation MC_0018 ! Please refer to the graphic for special considerations relating to your model ! Centre the drive pin and Insert the propeller onto the shaft spine. Rotate the propeller until the drive pin aligns with the internal slot in the propeller.
  • Page 16: Motor Installation

    Motor Installation MC_0026 ! Please refer to the graphic for special considerations relating to your model ! If required remove the adapter plate from the motor bracket Insert the lower part of the flexible coupling and tighten the set screw. Measure the height of the upper flexible coupling on the motor shaft. Calculate and insert the lower flexible coupling on the gear leg at the correct height as per graphic and insert the red “plastic ring”...
  • Page 17: Thruster Electrical Installation

    Thruster Electrical Installation MC_0143 ! Please refer to the graphic for special considerations relating to your model ! Information of electrical table. see next page - All power cable lengths represent the total length of the combined (+) and (-) cables. - Battery capacity is stated as minimum cold crank capacity, (CCA).
  • Page 18: Electrical Specifications

    Electrical Specifi cations MC_0044 SE IP 100 & SE IP 130 2653 2021...
  • Page 19: Technical Wiring Diagram

    Technical Wiring Diagram NB! Make sure to not use NB! Make sure to not use NB! Very important to check the following with main-switch any electronic interface position: any electronic interface After all electrical connections have been completed check with an box (delay box) older than box (delay box) older than ohm meter that there is no electrical connection between electro-...
  • Page 20 Technical Wiring Diagram NB! Make sure to not use NB! Make sure to not use any electronic interface any electronic interface box (delay box) older than box (delay box) older than the 6 1232i (ex. 6 122x) the 6 1232i (ex. 6 122x) on SP75Ti, SP95Ti, and SP125Ti.
  • Page 21: Control Panel Cable Installation

    (NB: If two or more control panels are operated at the same time in opposite directions, the electronic control box will stop the thruster until it receives a single signal or thrust in one direction.) • Sleipner on/off equipment it is entirely “plug & play” and require no additional confi guration setup. See the Control panel manual for more information. Pin 2...
  • Page 22: Control Panel Installation

    Control Panel Installation MC_0398 For Control Panel installation please refer to the supplied manual in your Sleipner product delivery Installation Guide Control Panel SLEIPNER AS DOCUMENT ID: P.O. Box 519 REVISION: DATE: N-1612 Fredrikstad Norway www.sleipnergroup.com LANGUAGE: SE IP 100 & SE IP 130...
  • Page 23: Pre-Delivery Checklist

    Pre-delivery Checklist MC_0033 []..The bolts holding the gear house and motor bracket together are tightened correctly. []..The bolts holding the motor to its bracket are tightened correctly. []..All electrical connections are clean, dry and tight, and the correct cable, fuse and main switch size.
  • Page 24: Service And Support

    10. This warranty gives you specific legal rights, and you may also have other rights which vary from country to country. Patents MC_0024 At Sleipner we continually reinvest to develop and offer the latest technology in marine advancements. To see the many unique designs we have patented visit our website www.sleipnergroup.com/patents SE IP 100 & SE IP 130...
  • Page 25 Notes MC_0037 ..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SE IP 100 & SE IP 130 2653 2021...
  • Page 26 Notes MC_0037 ..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SE IP 100 & SE IP 130 2653 2021...
  • Page 27 Notes MC_0037 ..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SE IP 100 & SE IP 130 2653 2021...
  • Page 28 © Copyright Sleipner Motor AS, 2021 The information given in the document was correct at the time it was published. However, Sleipner Motor AS can not accept liability for any inaccuracies or omissions it may contain. Continuous product improvement may change the product specifi...