Important - Please Read Contents of Packaging Please read these instructions carefully before starting installation and keep for future reference. Remove all packaging and check the product for missing parts or damage before starting installation. Any alterations made to this product and fittings may infringe water regulations and will invalidate the guarantee.
Page 8
Installation - Temperature Control Installation - Spout Before installing, flush through Drill a 30mm diameter hole in the Spout 80mm 80mm 80mm the pipework to ensure removal of required position. Make sure the debris, turn off the water supply. O-ring is in place in the underside of the spout cover.
Installation - Diverter Installation Drill a 48mm diameter hole Preparation in the required position. Before you start to install the Capsule you Handle Remove the handle connector will need to remove some of the fittings. lever from the concealed valve. Feed Unscrew the cover cap and remove the the diverter valve up through the inlet adaptor and washer at the bottom of...
Page 10
Installation Installation Remove the string Decide where to fit to the bath, it could go Fig 1 along the short or long edge, make sure Place the rubber washer over the adaptor. access can be gained to the underneath Insert the fibre washer into the adaptor, Escutcheon to connect water inlet, and be able to then fit and tighten the hose.
Page 11
Installation - Waste Temperature Commissioning Note: mixed water temperature at terminal fitting should never exceed Stop ring Fig.1 Rubber 46°C. seal Waste Stop arm The valve has been factory set under adaptor Existing pop-up balance pressures and hot water supply waste fittings Existing at 65°C.
Need help?
Do you have a question about the ARRONDI ARR-132-CP and is the answer not in the manual?
Questions and answers