Trane BAYGARD312 Series Installation Instructions Manual
Trane BAYGARD312 Series Installation Instructions Manual

Trane BAYGARD312 Series Installation Instructions Manual

Hail guards for foundation packaged rooftop units 7.5 to 12.5 tons

Advertisement

Quick Links

Installation Instructions
Hail Guards
Foundation™ Packaged Rooftop Units
7.5 to 12.5 Tons
Model Number:
BAYGARD312*
Only qualified personnel should install and service the equipment. The installation, starting up, and
servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires
specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified
person could result in death or serious injury. When working on the equipment, observe all
precautions in the literature and on the tags, stickers, and labels that are attached to the equipment.
January 2025
Used with:
EDK090-150, GDK090-150
SAFETY WARNING
ACC-SVN317A-EN

Advertisement

loading
Need help?

Need help?

Do you have a question about the BAYGARD312 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Trane BAYGARD312 Series

  • Page 1 Installation Instructions Hail Guards Foundation™ Packaged Rooftop Units 7.5 to 12.5 Tons Model Number: Used with: EDK090-150, GDK090-150 BAYGARD312* SAFETY WARNING Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training.
  • Page 2: Warnings, Cautions, And Notices

    Trane advocates the responsible handling of all refrigerants. Important Responsible Refrigerant Practices Trane believes that responsible refrigerant practices are important to the environment, our customers, and the air conditioning industry. All technicians who handle refrigerants must be certified according to local rules. For the USA, the...
  • Page 3 Introduction WARNING Proper Field Wiring and Grounding Required! Failure to follow code could result in death or serious injury. All field wiring MUST be performed by qualified personnel. Improperly installed and grounded field wiring poses FIRE and ELECTROCUTION hazards. To avoid these hazards, you MUST follow requirements for field wiring installation and grounding as described in NEC and your local/state/national electrical codes.
  • Page 4 For specific handling concerns with R-454B, contact your local representative. Copyright This document and the information in it are the property of Trane, and may not be used or reproduced in whole or in part without written permission. Trane reserves the right to revise this publication at any time, and to make changes to its content without obligation to notify any person of such revision or change.
  • Page 5: General Information

    General Information The accessory hail guards referred to in this installation guide are provided for use with Foundation™ 7.5 to 12.5 tons units. Inspection 1. Unpack all components of the kit. 2. Check carefully for shipping damage. If any damage is found, report it immediately, and file a claim against the transportation company.
  • Page 6: Installation

    Installation 1. Locate top screw locations by finding the corner post at the bend of the coil. Figure 1, p. 2. Align the hail guard frame over the existing screw holes. 3. Verify the provided screws and attachment locations are not going to penetrate the RTU coil.
  • Page 7 Notes ACC-SVN317A-EN...
  • Page 8 For more information, please visit trane.com or americanstandardair.com. Trane and American Standard have a policy of continuous product and product data improvement and reserve the right to change design and specifications without notice. We are committed to using environmentally conscious print practices.