A. Dimension of Valve 15.5 cm 11 cm 9.5 cm Figure 1 Dimension and Valve Layout model MSDU2-H B. Dimension of Product and Specification Model MPR-1044-H MPR-1054-H Tank Size 10” x 44” 10” x 54” Valve Model MSDU2-H Valve Media...
หลั ก การทำงานของเครื ่ อ งกรองน้ ำ 1. Service State 2. Backwash State 3. Brine and Slow State 4. Refill State 5. Fast rinse State TH| PEN K INTER TRADING CO.,LTD.
Safety Information General Observe all warnings that appear in this manual. ❖ This system is not intended to be used for treating water that is microbiologically unsafe or of unknown quality ❖ without adequate disinfection before or after the system. Keep the unit in the upright position.
Safety Information (Cont.) Location Selection Location of a water treatment system is important. The following conditions are required: Level platform or floor. ❖ Total minimum pipe run to water heater of ten feet (three meters) to prevent backup of hot water into system. ❖...
A. Dimension of Valve 15.5 cm 11 cm 9.5 cm Figure 1 Dimension and Valve Layout model MSDU2-H B. Dimension of Product and Specification Model MPR-1044-H MPR-1054-H Tank Size 10” x 44” 10” x 54” Valve Model MSDU2-H Valve Media...
Product Installation A. Installation notice Before installation, read all these instructions completely, Then obtain all materials and tools needed for installation. The Installation of product, pipes and circuits, should be accomplished by professional to ensure that the product can operate normally. Performing installation is according to the relative pipeline regulations and the specification of Inlet, Outlet, Drain and Brine Line Connector.
Pipeline Installation 1. Install Control Valve and Pipeline Connection (Refer to Figure 1-1, 1-2). When you are facing the front of the control valve, the left is for connecting inlet adaptor, the right is for connecting outlet adaptor, connect drain line adaptor on the right side and the left side is connecting of brine line.
Basic Setting & Usage A. ข้ อ มู ล จำเพาะของพารามิ เ ตอร์ Parameter Name Time Backwash 10 min Brine & Slow Rinse 30 - 60 min Fast Rinse 15 min Brine Refill 15 min B. Process BRINE REFILL : BRINE & SLOW RINSE : FAST RINSE : SERVICE : BACKWASH :...
Filtration and Backwash Switching Operation 1. After installation, please make sure the control valve is in the position of filtration-the handle (SERVICE : symbol ). 2. Open the inlet and outlet valve slowly, let the tap water fill the tank and eliminate the air inside the system. 3.
Working Principle of the Product 1. Service State 2. Backwash State 3. Brine and Slow State 4. Refill State 5. Fast rinse State EN| PEN K INTER TRADING CO., LTD.
Flow Rate curve Trouble Shooting Issue Possible Solution 1.Fails to backwash - Inlet water pressure too low - Ensure the inlet water pressure more than 2 bar - Backwash pressure too low - Ensure the faucet closed when backwash or enough back pressure 2.
Warranty Terms and Conditions This product is warranted to be free from defects in material and workmanship for a period of one (1) year from the date of purchase*. This warranty is for does not cover accessories subject to wear and tear during usage (seals, o-ring, etc). *PROOF OF PURCHASE REQUIRED The unit must be used in operating conditions that conform to PEN K’s recommended design guidelines.
Duration time to replacement filter Duration time to change filter shown in the table below. In case the media have expired or deteriorated, please inquiries or purchases through the company's service. Media Life Picture When reaching 1 years, the filter should be changed but Resin depending on the quality of water in that area.
Page 32
PEN K INTER TRADING CO., LTD. HEAD OFFICE : 1000/63-64 PB TOWER. 16th Floor. Sukhumvit 71 Road, North Klongtan,Wattana, Bangkok 10110 TEL. 0-2493-6565 FAX : 0-2391-1141 SERVICE CENTER : 63/3 Moo 6 Soi Suksawat 76, Bangchak, Phra Pradaeng, Samut Prakan 10130 TEL.
Need help?
Do you have a question about the MPR-1044-H and is the answer not in the manual?
Questions and answers