Table of Contents Model CE-CN-VF40 NG / Model CE-CN-VF50 NG Section Page General Information --------------------------------------------------------------------------------- 3 - 4 Safety and Warranty --------------------------------------------------------------------------------- 4 - 6 Technical Specifications ------------------------------------------------------------------------------- 6 Installation --------------------------------------------------------------------------------------------- 6 - 10 Operation ---------------------------------------------------------------------------------------------- 10 - 12 Maintenance...
If the package has suffered rough handling, bumps or damage (visible or concealed), please note it on the bill of lading before accepting the delivery and contact Omcan within 24 hours, so we may initiate a claim with the carrier. A detailed report on the extent of the damage caused to the machine must be filled out within three days, from the delivery date shown in the shipping documents.
Si el paquete ha sufrido un manejo de poco cuidado, golpes o daños (visible o oculto) por favor anote en la factura antes de aceptar la entrega y contacte Omcan dentro de las 24 horas, de modo que podamos iniciar una reclamación con la compañia.
Page 5
1 YEAR PARTS AND LABOUR WARRANTY Within the warranty period, contact Omcan Inc. at 1-800-465-0234 to schedule an Omcan authorized service technician to repair the equipment locally.
Safety and Warranty Unauthorized maintenance will void the warranty. Warranty covers electrical and part failures, not improper use. Please see https://omcan.com/disclaimer for complete info. WARNING: The packaging components are classified as normal solid urban waste and can therefore be disposed of without difficulty.
Page 7
Installation CGA-B149.2, as applicable. NOTICE These installation procedures must be followed by qualified personnel or warranty will be void. Local codes regarding installation vary greatly from one area to another. The National Fire Protection Association, Inc. states in its NFPA 96 latest edition that local codes are the “authority having jurisdiction” when it comes to installation requirements for equipment.
Installation NOTICE Unit must be level to assure maximum performance. Improper leveling may void warranty. NOTICE When this appliance is installed with casters, it must be installed with the casters supplied, a connector complying with either ANSI Z21.69 CSA 6.16 and a quick-disconnect device complying with ANSI Z21.41 CSA 6.9.
Installation wall fans is preferred over any type of direct venting. It is recommended that a canopy extend 6” past the appliance and the bottom edge be located 6’6” from the floor. Filters should be installed at an angle of 45° or more from the horizontal.
Installation If the incoming gas pressure is in excess of 14”WC (1/2PSI, 3.45 kPa), a proper step-down regulator will be required. See the below photo for LP application. Connect the gas supply directly to the 3/4” male NPT connector located near the lower left rear corner of the fryer.
Operation 3. While pressing the knob down, use a lit match to ignite the pilot. Continue to press the knob down for about 30 seconds. If the pilot does not stay lit when the knob is released, repeat the lighting procedure and keep the knob down longer.
Operation RELIGHTING WARNING In the event of a main burner ignition failure, a five minute purge period must be observed prior to re- establishing the ignition source. 1. Shut off all gas. 2. Wait five minutes. 3. Follow the “lighting” procedure. AUTOMATIC PILOT VALVE The automatic pilot valve provides an automatic safety shutoff for the fryer when the pilot flame is extinguished.
Maintenance and cleaned daily. Naturally, the frequency and extent of cleaning depends on the amount and degree of usage. Following daily and more extensive periodic maintenance procedures will increase the life of your equipment. Climatic conditions (e.g., salt air) may result in the need for more thorough and more frequent cleaning in order to keep equipment performing at optimal levels.
Maintenance CLEANING STAINLESS STEEL SURFACES To remove normal dirt, grease and product residue from stainless steel use ordinary soap and water (with or without detergent) applied with a sponge or cloth. Dry thoroughly with a clean cloth. Never use vinegar or any corrosive cleaner.
Page 15
Maintenance 4. Turn combination gas valve to “ON” position and thermostat to “ON.” The burners will ignite. Be certain that sufficient oil is covering the tubes. 5. With burners on, read manometer. 6. If the manometer does not read 4” W.C. for natural gas, or 10” W.C. for propane gas, adjust regulator. 7.
Page 16
Maintenance CHECKING AND ADJUSTING AUTO SAFETY PILOT The pilot flame should surround the thermopile for 1/2”. It must be large and sharp enough to cause the thermopile to glow a dull red, or sufficient to hold the safety valve open. 1.
Troubleshooting Problem Possible Cause Solution Burner does not light at all. Pilot is not lit. Light pilot. Loose, dirty, or corroded terminals Clean and tighten terminals on gas on gas valve. valve. Loose, dirty, or corroded terminals Clean and tighten terminals on on thermostat.
Parts Breakdown Model CE-CN-VF40 NG 48555 Model CE-CN-VF50 NG 48550...
Page 19
Parts Breakdown Model CE-CN-VF40 NG 48555 Item No. Description Position Item No. Description Position Item No. Description Position AK408 Basket for 48555 48346 Adjustable Foot for 48555 AK411 Thermopile for 48555 AK409 Crumb Screen for 48555 AS243 Valve-Ball-Drain-1-1/4” for 48555...
Warranty Registration Thank you for purchasing an Omcan product. To register your warranty for this product, complete the information below, tear off the card at the perforation and then send to the address specified below. You can also register online by visiting: Merci d’avoir acheté...
Page 24
à plus de 6500 produits provenant du monde entier. Desde 1951 Omcan ha crecido hasta convertirse en un líder en la distribución de equipos y suministros de alimentos en América del Norte industria de servicios. Nuestro éxito en estos años se puede atribuir a nuestro compromiso de fortalecer y desarrollar nuevas relaciones...
Need help?
Do you have a question about the CE-CN-VF40 NG and is the answer not in the manual?
Questions and answers