Dear Customer, Thank you for placing your trust in one of the products of Galletti S.p.a This product is the result of our work and our commitment to design, research, and production and has been made from the finest materials, employing state-of-the-art components and production technology.
Page 3
By en- ranty. suring this product is disposed of correctly, you will help Ū Galletti S.p.A. shall not accept any liability for injury to prevent potential negative consequences for the envi- or damage resultingcfrom improper use of the equip- ronment and human health.
All others forbidden or make some selection (fields) mandatory. models op-erates with R410A refrigerant. Please contact Galletti S.p.A. for verification. » Configuration options 1 RS485 serial board (Carel / Modbus protocol) Power supply...
A2B Accorroni E.G. s.r.l. Must be notified of the entity of the Ū Avoid obstacles to the outflow of air from the fan which damage with-in 8 days of the delivery date. could cause back suction (see section on 2.4 Installation Check that the following items are present: clearance requirements and dimensional p. 8);...
» Dampers components See the vibration dumpers mounting instructions RPE - HPE (code RG66013698). INSTALLATION CLEARANCE REQUIREMENTS AND DIMENSIONAL To guarantee the proper functioning of the unit and access for maintenance purposes, it is necessary to comply with the minimum installation clearance requirements shown in figures 2.3 ...
Page 9
» RPE-HPE FRAME 2 Model Version RPE-HPE 71-76 L - Q RPE-HPE 92-102...
Page 10
» RPE-HPE FRAME 3 Model Version RPE-HPE 92-102 L - Q RPE-HPE 122-142...
Page 11
» RPE-HPE FRAME 3+ Model Version RPE-HPE 94-104 L - Q RPE-HPE 122-142-164...
Page 12
» RPE-HPE FRAME 4 Model Version RPE-HPE 122-142-164 L - Q RPE-HPE 174-214 RPE-HPE 194 L - Q - S...
Page 13
» RPE-HPE FRAME 5 Model Version RPE-HPE 214 L - Q RPE-HPE 244 S - L - Q...
Page 14
» RPE-HPE FRAME 6 Model Version RPE-HPE 274 L - Q - S RPE-HPE 294 L - Q - S RPE-HPE 324 L - Q - S RPE-HPE 364 S - L...
START-UP The first start up must be carried out exclusively by as residue from the work carried out (e.g. welding). Continue qualified personnel and authorized by A2B Accorroni flushing until the water (to be disposed of ) becomes clear. E.G. (see warranty sheet attached). 2.
PLUMBING AND ELECTRICAL CONNECTIONS PLUMBING CONNECTION shown in the dimension tables at the end of the manual. WARNING: The water circuit must be set up in such a way All the units belonging to the LCX series are equipped with wa- as to guarantee that the nominal flow rate of the water sup- ter differential pressure switch or flow switch, safety valve, water plied to the evaporator remains constant (+/- 15%) in all op-...
Ū Pair of quick-connection couplings with pipe section to be by the supplier welded (optional item that may be selected from the price The water must be analysed: it is advisable to contact a qualified list). They facilitate the connecting operations to the plumb- water treatment specialist to determine the most suitable type ing system, greatly speeding up installation of treatment according to the materials used in the hydraulic...
temperature during the fluctuations: -10-5=-15°C, recom- contact the manufacturer. mended ethylene glycol percentage: >30%. Failure to install filters and vibration dampers may cause prob- lems of clogging, breakages and noise, for which the manufac- Important! If different antifreeze product is to be used, please turer may not be held liable.
Pressure switch 1 is set at the “PS” (maximum admissible pressure) of the system Pressure switch 2 will have the setting = PS x 0.9 in accordance with the reference technical standard WATER CIRCUIT » LCX (evaporator) LEGEND Evaporator Flow switch 10 - 11 - 12 -...
ELECTRICAL CONNECTIONS appropriate cable gland. Tighten the wires securely to the terminals and clamp the cable All operations must be performed by qualified service personnel in place with the cable holder (figure p. 30). in accordance with current laws and regulations. For any electri- To preserve the protection degree of the machine, use a cable cal work on the unit, refer to the electric diagrams supplied with gland compatible with the sheath or power cable diameter, in...
Page 31
RPE - HPE Power supply V-ph-Hz 400 - 3N - 50 Maximum power input 75,4 88,4 Maximum current absorption Start up current Startup current with soft starter Fan motor rated power 6,30 6,30 6,30 6,30 8,40 8,40 8,40 8,40 Fan motor rated current 15,0 15,0 15,0...
Page 32
RPE - HPE Power supply V-ph-Hz 400 - 3N - 50 Maximum power input 62,3 63,9 73,2 71,7 86,5 99,5 Maximum current absorption Start up current Startup current with soft starter Fan motor rated power 4,02 4,02 4,02 4,02 4,02 4,02 4,02 6,10...
OPERATING LIMITS The graphs below illustrate the operating limits of LCX units (in operating limits. Attempting to operate the units beyond the case of continuous operation) in relation to the outlet water these limits could cause irreparable damage to the units temperature and outdoor air temperature.
OPERATING LIMITS IN HEAT PUMP MODE » Operating limits in heat pump mode Evaporation control Electronic expansion valve Standard Operating range calculated with temperature difference of 5°C on the water side. To operate with outdoor air temperatures below 0°C the temper- ature of the water produced will be reduced to 45°C.
CONTROL AND SAFETY DEVICES All the control and safety devices are set and tested in the factory before the unit is dispatched. CONTROL DEVICES 7.2.6 Water safety valve The water safety valve opens when the pressure within the wa- ter circuit reaches a level that may cause damage to the unit. 7.1.1 Service thermostat The service thermostat activates and deactivates the compres- 7.2.7 Safety device settings...
ROUTINE MAINTENANCE AND CHECKS It is recommended to carry out periodic checks of the safety it must be inspected by qualified personnel who must first devices (pressure switches and safety valves) and verify the ab- check the integrity of the cooling circuit (pipes and compo- sence of refrigerant leaks.
COOLING CIRCUITS » Legend N° COMPONENT Chilled water inlet Chilled water outlet De-superheater water inlet De-superheater water outlet Charge connection High pressure switch Low pressure switch Compressor Condenser De-superheater Buffer tank Evaporator Dehydrating filter Flow switch High pressure gauge Low pressure gauge Fan motor Chilled water circulation pump Gate valve...
Operations marked with the letter "S" may be performed exclusively by specialised personnel. Once the cause has been identified, you are advised to contact a Galletti S.p.A. service centre or a qualified technician for help.
Page 44
Who can take corrective action Possible control panel SYMPTOM U = User Probable cause Possible remedy indication S = specialised personnel Pressure switch failure Check and replace Excessive refrigerant charge Discharge the excess gas Finned coil obstructed, Remove dirt from the coil and insufficient air flow any obstacles to air flow Fan not working...
Page 45
Who can take corrective action Possible control panel SYMPTOM U = User Probable cause Possible remedy indication S = specialised personnel Expansion valve is not Check and replace working properly Water circulation pump Release the pump blocked Frost in the Water circulation pump Check the pump and replace it compressor intake...
11 RETIRING THE UNIT When the unit has reached the end of its working life and needs to removed and replaced, a series of operations should be car- ried out: Ū the refrigerant gas it contains should be recovered by spe- cialised personnel and sent to a waste collection facility;...
Page 48
A2B Accorroni E.G. s.r.l. Via d’Ancona, 37 - 60027 Osimo (An) - Tel. 071.723991 web site: www.accorroni.it - e-mail: a2b@accorroni.it...