Summary of Contents for MIMAKI Y8018P

  • Page 1 Tx-Y8018P POWDER SHAKER User Manual 2023.06...
  • Page 2: Table Of Contents

    Table of Contents FOREWARD..........................3 About The Manual......................3 1. Safety Operating Instructionrs ................... 4 Brief Introduction......................4 Safety Symbols....................... 4 Warning and Precaution for Use.................. 4 Installation Precautions....................5 2. Install Preperation ........................ 6 Machine Specifications....................6 Operating Conditions..................... 6 Electrical connecton requirements................
  • Page 3: Foreward

    FOREWARD Congratulations on your purchase of Y8018P Powder Shaker. Be sure to read this Operation Manual carefully and fully understand it before using the machine. Also, always keep this Operation Manual at hand and use it. About The Manual •...
  • Page 4: Safety Operating Instructionrs

    1. Safety Operating Instructions 1.1 Brief Introduction This Chapter introduces the important safety information. Please read and understand the safety information carefully before operating the machine. 1.2 Safety Symbols This caution symbol represents danger. Failure to observe the instructions given with this symbol can lead to serious injury to personnel and damage to the machine.
  • Page 5: Installation Precautions

    1.3 Warning and Precaution for Use Continued High Voltage Precaution to Avoid Personnel Shock or Fire • The machine should be grounded, according to the local safety electrical connection regulation. The ground voltage should be less than 3V. • Set the machine on smooth flat ceramic tile or ceramic ground. •...
  • Page 6: Install Preperation

    2. Install Preperation This is a pre-install guide for Y8018P Powder Shaker. Customers are recommended to prepare the room and other necessary devices before the machine arrives for installation. • Machine requires forklift to remove from box. • Do not place anything on the installation site, and make sure that people do not approach the installation place.It may cause damage...
  • Page 7: Electrical Connecton Requirements

    Do Not Install the Machine in the Following Places: • A location near a fire • Places exposed to direct sunlight • Places subject to vibration • Places subject to extreme changes in temperature or humidity • Places near an air conditioner or a heater •...
  • Page 8: Installation

    3. Installation 3.1 Unpack Box Machine comes in wooden box (crate). 1. Unpack the crate and place 4pcs wooden/metal blacks under the wheels to lift the machine from the base. 2. Lift the machine from the gap between machine and base. Place in install space. 3.2 Connect Power 1.
  • Page 9: Install Valve Under The Filtration

    3.3. Where to Install the Valve 1. Find the valve from the powder tray and install it into the hole that’s under the filtration.
  • Page 10: Names Of Parts And Functions

    4. Names of Parts and Functions 4.1 Front of the Machine 1. Emergency stop switch. 2. Main power switch. 3. Powder spray box. 4. Media sensor (Belt move forward when film is detected) 5. Preheating plate 6. Cooling fans 7. Powder preheating lamp (inside)
  • Page 11 4.2 Powder Applicator and Shaker 8. Intelligent powder control system (Powder spray motor stop working when the powder reaches a certain weight) 9. Powder shake bar. 10. Rear feeding cylinder with vacuum...
  • Page 12: Back Of The Machine

    4.3 Back of the Machine Vented oven lid Heating lamp Mesh belt vacuum and heating system Front feeding cylinder with vacuum Additional vacuum plate (Prevent film dropping) Tension take up system Material Cooling fans Zone filtration device Charcoal and HEPA filtration core Machine cooling fans Powder recycle tray...
  • Page 13: Electrical Box

    4.4 Electrical Box 220v main power inlet AC contactor Power supply PLC controller Heating controller Sensor and motor driver board Motor driver board...
  • Page 14: Basic Operation

    5. Basic Operation 5.1 Setting the Film Turn on the machine and load the film according to below diagram: • Once the printer has printed enough transfers to cover the front preheating board and the media extends to the first of two vacuum cylinders ensure that the PET transfer media is aligned correctly to inhibit any skew that may be present through the heating tunnel and take-up reel.
  • Page 15: Main Panel Interface

    5.2 Main Panel Interface...
  • Page 16: Parameter Panel Interface

    5.3 Parameter Panel Interface...
  • Page 17: Trouble Shooting

    5.4 Trouble Shooting IO to check working condition of machine.
  • Page 18: Maintenance

    6. Maintenance • Switch on the waste oil valve and drain out the waste oil from the bottom of the filtration every 1-2 weeks. • Open the filtration gate first then open the vented oven lid and check if clean the waste oil around the cover every 1-2 weeks.
  • Page 19: Appendix 1: 2-Way Drive Board Informaition

    Appendix 1: 2-Way Drive Board Information...
  • Page 20: Appendix 2: 5-Way Drive Board Informaition

    Appendix 2: 5-Way Drive Board Information...
  • Page 21: Appendix 3: 4-Way Drive Board Informaition

    Appendix 3: 4-Way Step Motor Driver Board Information...
  • Page 22: Appendix 4: Plc Information

    Appendix 4: PLC Information...

This manual is also suitable for:

Tx-y8018p

Table of Contents