FOREWARD Congratulations on your purchase of Y8018P Powder Shaker. Be sure to read this Operation Manual carefully and fully understand it before using the machine. Also, always keep this Operation Manual at hand and use it. About The Manual •...
1. Safety Operating Instructions 1.1 Brief Introduction This Chapter introduces the important safety information. Please read and understand the safety information carefully before operating the machine. 1.2 Safety Symbols This caution symbol represents danger. Failure to observe the instructions given with this symbol can lead to serious injury to personnel and damage to the machine.
1.3 Warning and Precaution for Use Continued High Voltage Precaution to Avoid Personnel Shock or Fire • The machine should be grounded, according to the local safety electrical connection regulation. The ground voltage should be less than 3V. • Set the machine on smooth flat ceramic tile or ceramic ground. •...
2. Install Preperation This is a pre-install guide for Y8018P Powder Shaker. Customers are recommended to prepare the room and other necessary devices before the machine arrives for installation. • Machine requires forklift to remove from box. • Do not place anything on the installation site, and make sure that people do not approach the installation place.It may cause damage...
Do Not Install the Machine in the Following Places: • A location near a fire • Places exposed to direct sunlight • Places subject to vibration • Places subject to extreme changes in temperature or humidity • Places near an air conditioner or a heater •...
3. Installation 3.1 Unpack Box Machine comes in wooden box (crate). 1. Unpack the crate and place 4pcs wooden/metal blacks under the wheels to lift the machine from the base. 2. Lift the machine from the gap between machine and base. Place in install space. 3.2 Connect Power 1.
4. Names of Parts and Functions 4.1 Front of the Machine 1. Emergency stop switch. 2. Main power switch. 3. Powder spray box. 4. Media sensor (Belt move forward when film is detected) 5. Preheating plate 6. Cooling fans 7. Powder preheating lamp (inside)
Page 11
4.2 Powder Applicator and Shaker 8. Intelligent powder control system (Powder spray motor stop working when the powder reaches a certain weight) 9. Powder shake bar. 10. Rear feeding cylinder with vacuum...
4.3 Back of the Machine Vented oven lid Heating lamp Mesh belt vacuum and heating system Front feeding cylinder with vacuum Additional vacuum plate (Prevent film dropping) Tension take up system Material Cooling fans Zone filtration device Charcoal and HEPA filtration core Machine cooling fans Powder recycle tray...
4.4 Electrical Box 220v main power inlet AC contactor Power supply PLC controller Heating controller Sensor and motor driver board Motor driver board...
5. Basic Operation 5.1 Setting the Film Turn on the machine and load the film according to below diagram: • Once the printer has printed enough transfers to cover the front preheating board and the media extends to the first of two vacuum cylinders ensure that the PET transfer media is aligned correctly to inhibit any skew that may be present through the heating tunnel and take-up reel.
6. Maintenance • Switch on the waste oil valve and drain out the waste oil from the bottom of the filtration every 1-2 weeks. • Open the filtration gate first then open the vented oven lid and check if clean the waste oil around the cover every 1-2 weeks.
Need help?
Do you have a question about the Y8018P and is the answer not in the manual?
Questions and answers
what type of oil do we use to refill after draining out old oil