4.5 Specification. product, otherwise the product may be unstable or Up to 9 SIMPO HV can be connected in series in a damaged. single tower controlled by 1 BMS. Up to 8 towers When using different tools, master the tools in can be connected in parallel at the same time.
① The location of SIMPO HV installation should be suitable for safe operation and long-term use. As SIMPO HV should be fixed to the wall, location *Number ① ~ ⑨ represent modules sequence only selected should be against the wall.
CAN_H CAN_L RS485B RS485A Figure 5. 12 Table on top is the Pin Number and definition of 'INV' port of SIMPO HV. Please check this table and SIMPO HV SIMPO HV KOSTAL the installation guide of inverter in use then change PIN NO.
2. System is connected to mobile devices: Flash normally. 0%<SOC≤20% 3. Not connected to any device or internet: Solid On When the LED is off, the wifi function of SIMPO HV is Figure 6.1 off. The SOC status indicator visually displays the 6.4 Set On...
Figure 5. 20 SIMPO HV allows up to 8 towers to be paralleled(1 master tower and 7 slave towers in the system). Up to 9 modules can be connected in series within one tower. To parallel multiple towers, please follow the steps below: Ensure that the number of modules in the towers of the paralleled towers is equal, otherwise the paralleling will fail due to unbalancing voltage of the towers.
5. Turn off all the air switches. Figure 8.1 ZYC Energy has designed an air switch for each BMS to protect all modules in a single tower controlled 8.4 Charging and Discharging by that bms. It is mounted on the side of the BMS.
Three options are listed below to realize the remote monitoring. 1. Connect the ETH port on SIMPO HV BMS to the router via a network cable and link your system to the internet. 2.First make sure the wifi function is on, then use laptop or mobile phone to connect to SIMPO HV's WIFI hotspot, and monitor the system through ZYC Assist or ZYC Assist Pro.
SIMPO HV Installation and Operating Manual_V2.2 10 Extension periodically. If there is dust or stains on the enclosure of SIMPO HV, use a brush or soft towel or to wipe the enclosure to remove the dust. Do When expanding the system, please make sure...
Page 18
Contact Us ZYC Energy Australia Pty Ltd Suite 37 Ridge St North Sydney NSW 2060, Australia +61 2 8006 1868 service@zyc-energy.com.au ZYC Lithium Batteries S.L. Calle Angelita Cavero 13 Oficina 4 Madrid (28027), Madrid, España +34 6 97919475 / +49 7119987199 service@zyc.energy...
Need help?
Do you have a question about the SIMPO HV and is the answer not in the manual?
Questions and answers