Summary of Contents for ZYC ENERGY SIMPO HV

  • Page 1 SIMPO HV Installation and Operating Manual _V2.2(EN) Version: V2.2 Released Date: 2024-11-14...
  • Page 2: Table Of Contents

    5.1 Requirement For Installation Location ............4 5.2 Tools ......................5 5.3 Place The Base ....................5 5.4 Position of Fixing Part ...................5 5.5 Power Cables Crimping ................6 5.6 Fix To The Wall ....................6 Copyright© 2024 ZYC Energy Co., Ltd. All Rights Reserved.
  • Page 3 10 Extension ....................14 11 Troubleshooting ..................14 12 Maintenance and Storage ................. 14 13 Disposal of SIMPO HV ................14 14 Compatible Inverter .................. 14 Copyright© 2024 ZYC Energy Co., Ltd. All Rights Reserved.
  • Page 4: Introduction

    4.5 Specification. product, otherwise the product may be unstable or Up to 9 SIMPO HV can be connected in series in a damaged. single tower controlled by 1 BMS. Up to 8 towers When using different tools, master the tools in can be connected in parallel at the same time.
  • Page 5: Battery Module Leakage

    Please do not use and contact us. battery to prevent damage to the battery • Protect the battery from being damaged during transporting and handling. Copyright© 2024 ZYC Energy Co., Ltd. All Rights Reserved.
  • Page 6: Product Information

    ON/OFF ON/OFF Figure 4.3 Inverter Com Extra Accessories PE Connection COM In The parts below are not included in SIMPO HV Air Switch package but necessary for connecting to the inverter. Copyright© 2024 ZYC Energy Co., Ltd. All Rights Reserved.
  • Page 7: Specifications

    Well-ventilated with good air circulation. e) Keep away from children or pets to prevent injury 5.1 Requirement For Installation by accident. Location The location of installation should be suitable for Copyright© 2024 ZYC Energy Co., Ltd. All Rights Reserved.
  • Page 8: Tools

    ① The location of SIMPO HV installation should be suitable for safe operation and long-term use. As SIMPO HV should be fixed to the wall, location *Number ① ~ ⑨ represent modules sequence only selected should be against the wall.
  • Page 9: Power Cables Crimping

    *Cables of 8/10 AWG is recommended to meet the need of SIMPO HV. *Determine the cable size according to your system. Check the table below for proper cable size. Torque=5N*m Torque=3.5N*m Figure 5.6 Copyright© 2024 ZYC Energy Co., Ltd. All Rights Reserved.
  • Page 10: Cables Connection

    After finish the connection of battery side, connect the power cables to the inverter. Figure 5. 9 SIMPO HV is a high voltage product with minimum of 128V. Improper operation may lead to serious safety Copyright© 2024 ZYC Energy Co., Ltd. All Rights Reserved.
  • Page 11: Communication With Different Inverter Models

    CAN_H CAN_L RS485B RS485A Figure 5. 12 Table on top is the Pin Number and definition of 'INV' port of SIMPO HV. Please check this table and SIMPO HV SIMPO HV KOSTAL the installation guide of inverter in use then change PIN NO.
  • Page 12: Human Machine Interface(Hmi)

    2. System is connected to mobile devices: Flash normally. 0%<SOC≤20% 3. Not connected to any device or internet: Solid On When the LED is off, the wifi function of SIMPO HV is Figure 6.1 off. The SOC status indicator visually displays the 6.4 Set On...
  • Page 13 6.7 Alarm Alarm Alarm Default Fault Figure 6.5 When the system is working normally, ‘Alarm’ will keep off, and when serious fault(including over- voltage, over-current, etc) occurs, 'Alarm' will light up orange. Copyright© 2024 ZYC Energy Co., Ltd. All Rights Reserved.
  • Page 14: Parallel Multiple Towers

    Figure 5. 20 SIMPO HV allows up to 8 towers to be paralleled(1 master tower and 7 slave towers in the system). Up to 9 modules can be connected in series within one tower. To parallel multiple towers, please follow the steps below: Ensure that the number of modules in the towers of the paralleled towers is equal, otherwise the paralleling will fail due to unbalancing voltage of the towers.
  • Page 15: Commissioning

    5. Turn off all the air switches. Figure 8.1 ZYC Energy has designed an air switch for each BMS to protect all modules in a single tower controlled 8.4 Charging and Discharging by that bms. It is mounted on the side of the BMS.
  • Page 16: Connect To The Internet&Zyc Portal&Zyc Assist

    Three options are listed below to realize the remote monitoring. 1. Connect the ETH port on SIMPO HV BMS to the router via a network cable and link your system to the internet. 2.First make sure the wifi function is on, then use laptop or mobile phone to connect to SIMPO HV's WIFI hotspot, and monitor the system through ZYC Assist or ZYC Assist Pro.
  • Page 17: Extension

    SIMPO HV Installation and Operating Manual_V2.2 10 Extension periodically. If there is dust or stains on the enclosure of SIMPO HV, use a brush or soft towel or to wipe the enclosure to remove the dust. Do When expanding the system, please make sure...
  • Page 18 Contact Us ZYC Energy Australia Pty Ltd Suite 37 Ridge St North Sydney NSW 2060, Australia +61 2 8006 1868 service@zyc-energy.com.au ZYC Lithium Batteries S.L. Calle Angelita Cavero 13 Oficina 4 Madrid (28027), Madrid, España +34 6 97919475 / +49 7119987199 service@zyc.energy...