Download Print this page

Installing Transceivers Into The Transceiver Ports; Grounding The Switch - D-Link DSS-200G-10MP Quick Installation Manual

Poe switch with 8 10/100/1000base-t ports and 2 1000base-x sfp ports

Advertisement

Available languages

Available languages

Then, use the screws provided with the equipment rack to mount the switch in the rack.

Installing Transceivers into the Transceiver Ports

The DSS-200G-10MP switch is equipped with the ports for connecting the SFP
transceivers.

Grounding the Switch

This section describes how to connect the switch to the ground. You must complete this
procedure before powering on the switch.
Required tools and equipment:
• Ground screws: One M4 x 6 mm (metric) pan-head screw.
• Grounding cable (not included in the accessory kit): The grounding cable should be
sized according to local and national installation requirements. Depending on the
Figure 3 — Installing the switch in a rack
Figure 4 — Inserting transceivers into the transceiver ports
4

Advertisement

loading
Need help?

Need help?

Do you have a question about the DSS-200G-10MP and is the answer not in the manual?