Contents Contents Dear Customer Intended use Types of safety warning sign Planning Pellet Outside Storage General Preparatory work Dimensions 4 Preparation surface Parts list 6 Assembly foot profiles Structure base plate Structure fabric tank 9 Structure base frame 10 Application foil 10.1 Do-it-Yourself facade 11 Line routing...
1 Dear Customer Dear Customer Thank you very much for your trust. With this quality product from ÖkoFEN, you are getting an innovative product with state-of-the-art technology. ÖkoFEN is Europe's specialist for really green heat. This manual is intended to help you operate the product safely, properly and eco- •...
2 Types of safety warning sign Types of safety warning sign The warning signs use the following symbols and texts. Types of safety warning sign Risk of injury Consequences of risk Avoiding risk DANGER Danger - indicates a situation that could lead to death or lifethreatening injury. ▶...
3 Planning Pellet Outside Storage Planning Pellet Outside Storage General Preparations Where and how are the suction lines, power supply for motor (5 x 1,5 mm ) and grounding (min. 6 mm ) routed into the house? Selection of suitable above- or below-ground cable routing and wall penetration incl.
3 Planning Pellet Outside Storage Preparatory work Secure location choice • Level surface, free from backwater Safety against slipping, accessibility for filling process • Excavate the soil at least 10 cm, compact and gravel. • Recommendation: • Align 9 pieces of concrete slabs (40x40x4 cm) in the scale. •...
3 Planning Pellet Outside Storage Variant 2 above ground line routing For above-ground piping, install a protective pipe with at least Ø DN160 and • bends with max. 45°. Install the wall duct by means of a pipe duct and a lining pipe (to be provided in •...
4 Preparation surface Preparation surface There are different regulations in the different European countries. Please mind the prescription of your country. Underground pipe - Ø 200 min. 500 The underground pipe can be placed to • the left or right of the central exposed aggregate concrete slab at the front of the fabric tank! b) Concrete slabs...
5 Parts list Parts list Dimensions in Quan- Part Illustration tity Foot profile Foot profile Middle foot profile Installation manual...
Page 11
5 Parts list Dimensions in Quan- Part Illustration tity Middle foot profile Rear/front foot profile Base plate 27x500x2256 Installation manual...
Page 12
5 Parts list Dimensions in Quan- Part Illustration tity Base plate 27x440x2256 Angle connector Spacer boards rear|side 27x127x196 Installation manual...
Page 13
5 Parts list Dimensions in Quan- Part Illustration tity Spacer boards side 27x100x196 Stand 100x100x2300 Cross boards below 27x248x2254 Installation manual...
Page 14
5 Parts list Dimensions in Quan- Part Illustration tity Longitudinal boards below 27x248x1498 Longitudinal profile roof 100x100x1471 Rafters 100x100x2254 Installation manual...
Page 15
5 Parts list Dimensions in Quan- Part Illustration tity Cross boards top 27x300x2254 Longitudinal boards top 27x300x1498 Cross boards middle 27x196x2254 Installation manual...
Page 16
5 Parts list Dimensions in Quan- Part Illustration tity Longitudinal boards middle 27x196x1498 Stand 50x80x2300 Cross board front short - top 27x300x832 Installation manual...
Page 17
5 Parts list Dimensions in Quan- Part Illustration tity Upright extension 50x80x98 Cross board front short - middle 27x196x832 Cross board front short - below 27x248x832 Installation manual...
Page 18
5 Parts list Dimensions in Quan- Part Illustration tity Roof boards 27x500x1471 Roof boards 27x248x1471 Door holder Grinding wheel Edge protection Installation manual...
Page 19
5 Parts list Dimensions in Quan- Part Illustration tity Foil Nail tape - 20 m roll Small parts Suction socket set Installation manual...
Page 20
5 Parts list Dimensions in Quan- Part Illustration tity wall connection - outside wall connection - inside Check the completeness of the delivery before starting assembly. Installation manual...
6 Assembly foot profiles Assembly foot profiles Carry out the process on both sides. 1. Connect the second foot profile with the foot profile connector. No. 1 (2x) + No. 1a (2x) 2. Screw the foot profile connector to the foot profiles. Installation manual...
Page 22
6 Assembly foot profiles 3. Connect the second middle foot profile with the foot profile connector. No. 2 (1x) + No. 2a (1x) 4. Screw the foot profile connector to the middle foot profiles. Installation manual...
7 Structure base plate Structure base plate Align the 2 outer foot profiles so that the outer edges of the foot profiles are flush with the outer edges of the exposed aggregate concrete slabs. Align the middle foot profile so that the support surface is in the same alignment as that of the outer foot profiles and ensure central positioning on the exposed aggre- gate concrete slab! Make sure that the surface is horizontal!
Page 24
7 Structure base plate Dimensions mounting screws 2. Screw the front and rear foot profiles to the base plates. 2890 2550 2450 2050 1950 1550 1450 1050 1050 Specifications in mm No. 3 (2x) - 5x40 (8x) + ØM5 NOTICE Check the placement of the floor on the exposed aggregate concrete slabs! The outer edges of the foot profiles must be flush with the exposed aggregate con- crete slabs at the sides and front of the outer tank.
8 Structure fabric tank Structure fabric tank Assemble the fabric tank according to the enclosed assembly instructions. NOTICE Place the 2 rear stands against the tab. Make sure they are parallel and positioned at a right angle. ▶ Check the diagonal dimension! Mounting of the drive unit NOTICE Observe motor alignment!
Page 26
8 Structure fabric tank Once the fabric tank has been fully assembled, all 4 stands must be screwed to the base plate using the enclosed fastening set (4x). NOTICE Ensure accurate perpendicular alignment before securing the fabric tank with the mounting kit.
9 Structure base frame Structure base frame NOTICE Damage to the fabric The wood screws must not be countersunk too deeply and should be flush with the wood. Assembly of the spacer boards Carry out the process on both sides. NOTICE The spacer boards must be pre-drilled.
Page 28
9 Structure base frame Assembly of the stands Carry out the process on both sides. 1. Place and screw the 2 stands with the angle connectors (2x each side) on the base plates and with the spacer boards on the fabric tank (3x each side). No.
Page 29
9 Structure base frame Assembly of the lower longitudinal and cross boards Carry out the process on both sides. 1. Place and screw the cross board to the bottom 2. Place and screw the two longitudinal boards at of the fabric tank with the spacer boards and the the bottom of the fabric tank with the uprights (6x uprights (10x).
Page 30
9 Structure base frame Assembly of the front stands Carry out the process on both sides. 1. Place and screw the stands to the bottom of the fabric tank with the longitudinal boards (2x on each side). No. 9 (2x) - 5x70 Installation manual...
Page 31
9 Structure base frame Assembly of longitudinal profiles NOTICE The longitudinal profiles must be pre-drilled. 1. Place and screw the 4 longitudinal profiles to the stands. No. 12 (4x) - 6x150 (10x) Installation manual...
Page 32
9 Structure base frame Assembly of rafters and roof NOTICE The longitudinal profiles must be pre-drilled. NOTICE The roof boards must be pre-drilled. NOTICE Ensure accurate perpendicular alignment before installing the rafters and roof boards. ▶ Check the diagonal dimension! 1.
Page 33
9 Structure base frame 2. Place and screw the 2 stands with the angle connectors (1x each side) on the base plates. No. 6 (2x) Installation manual...
Page 34
9 Structure base frame Assembly of the longitudinal and cross boards Carry out the process on both sides 1. Place and screw the two longitudinal boards with 2. Place and screw the two longitudinal boards the longitudinal profiles, rafters and the uprights with the longitudinal profiles, rafters and the (18x each side).
Page 35
9 Structure base frame Assembly of the longitudinal and cross boards Carry out the process on both sides. 1. Place and screw the cross board at the height of 2. Place and screw the two longitudinal boards at the rear spacer boards to the spacer boards and the height of the rear spacer board to the uprights uprights.
Page 36
9 Structure base frame Assembly of the cross boards door 1. Place and screw the 2 cross boards to the stands and rafters. No. 19 (2x) - 5x70 (8x) Installation manual...
Page 37
9 Structure base frame Assembly of the door stands 1. Place and screw the two stands to the foot pro- 3. Place and screw the two upright extensions to file. the cross boards and screw the cross board to the door uprights.
Page 38
9 Structure base frame Assembly roof 1. Place and screw the 10roof boards. Screw the roof boards 2x to each rafter. The roof boards must be flush with the cross and longitudi- nal boards. No. 23 (8x) + No. 24 (2x) - 5x70 (60x) Mounting door holder 1.
10 Application foil Application foil Sand down edges and apply edge protection 1. Round off the outer edges of the entire outer 2. Place an edge protector at all four corners of the tank marked in red using the enclosed grinding roof and fasten each one with two nails.
Page 40
10 Application foil At least two people and a stepladder are needed to apply the foil. Unwrap the foiland make sure that the zipper is on the front side. Open both zippers to 20 cm. Place the foil on the roof and align it so that the foil can be pulled down at the corners.
10 Application foil 10.1 Do-it-Yourself facade The Pellet Outside Storage can be optionally clad with a do-it-yourself facade. Facade wood NOTICE Nail sealing tape Use the enclosed nail sealing tape to seal the outer tank. ▶ Screw the facade to the center of the nailing strip! Mount the nail sealing tape on the outside of the foil.
11 Line routing Line routing Mounting the connection flange on the outer tank For the line routing, the foil and the wood must be drilled through in the area of the discharge motor on the left or right side of a longitudinal board. Depending on the conditions on site, the placement of the line routing may vary.
Page 43
11 Line routing Mounting wall connection Check with the builder or an expert to determine the appropriate penetration for a brick wall. NOTICE Pellet hoses laid outdoors must be protected from UV radiation by a protective tube (provided by customer). ▶...