Din rail smart meter for single and three phase electrical systems (23 pages)
Summary of Contents for Eastron SDM120CTM
Page 1
CT-Meter installation guidance Preparation List: 1. Meter :SDM120CTM 100mA 2. CT: ESCT-TA16 100A/100mA Communication definition: Inverter Meter Inv_Pin 1 RS485A------Meter_10 RS485A Black line-----Meter_1 Inv_Pin 2 RS485B------Meter_9 RS485B White line-----Meter_2 Diagram: Black line White line Debugging steps: 1. Ensure that the current ratio is 100A/100mA, if it is other types of nA /100mA, set the ratio on the meter side according to the Appendix.
Page 2
Appendix There is a button on the front of the meter. After initialization and self-checking program, the meter display the measured values. The default page is total kWh. If the user wants to check other information, he needs to press the scroll button on the front panel. Click the button, the LCD display will scroll the measurements.
Page 3
Modbus Address ( ID) Default: 001 Baud rate Default : 2400bps Parity Option: None/even/odd Default: none Primary current 5A-9999A Default: 5 Set-up Mode To get into set-up mode, the user need keep pressing the button for 3 seconds, the meter LCD will shows “-SET-“.
Need help?
Do you have a question about the SDM120CTM and is the answer not in the manual?
Questions and answers