INSTALLATION INSTRUCTIONS
400 Amp Outdoor Meter Main, Ringless, Lever Bypass, OH/UG Service Entrance Enclosure
Cat. Nos. LS1xx-SLD, LS1xx-S5D
IMPORTANT SAFETY INSTRUCTIONS - READ ALL INSTRUCTIONS BEFORE USING.
• TO AVOID FIRE, SHOCK, OR DEATH: TURN OFF POWER THAT IS SUPPLYING THIS EQUIPMENT AND CONFIRM POWER IS OFF before
installing, removing, or servicing this equipment.
• This equipment MUST BE installed and serviced by an electrician.
• To be installed and/or used in accordance with electrical codes and regulations.
• Use ONLY approved fittings and clamps to avoid damage to wires.
• Leviton circuit breakers MUST BE used with a Leviton circuit breaker enclosure.
• Use ONLY Leviton approved conduit hubs to avoid water intrusion.
• Before providing power to the load center, check all electrical connections and confirm that the wiring is correct.
• Replace all doors and covers before connecting power to this equipment.
•
SAVE THESE INSTRUCTIONS.
LIMITED PRODUCT WARRANTY
For Leviton's limited product warranty, go to www.leviton.com. For a printed copy of the warranty, you may call 1-800-323-8920.
Patents covering this product, if any, can be found on Leviton.com/patents.
INSTALLATION
WARNING: TO AVOID FIRE, SHOCK, OR DEATH,
TURN OFF POWER THAT IS SUPPLYING THIS
EQUIPMENT AND CONFIRM POWER IS OFF before
installing, removing, or servicing this equipment.
Step 1: Remove Meter Compartment Cover (A).
(See Figure 1.)
a. Push up the Securing Latch (B).
b. Slide the cover down and out.
Step 2: (Optional) Remove load center door.
(See Figure 2.)
NOTE: Remove the load center door for an
easier installation.
a. Lift Door (C) upward and remove it from Hinge (D).
b. When installation is complete, align door Hinge (D)
with the hinge pin, and slide the door down until it is
seated properly.
Step 3: Enclosure Openings.
For bottom feed wiring: (See Figure 3.)
NOTE: Before removing any knockouts from the
enclosure, consult local electrical codes to determine the
knockout requirements.
a. To remove Knockout (E), use a screwdriver to strike
the center of the knockout.
b. Pry each Ring (F) up, one at a time, and grip both
ends with a pair of pliers.
c. Use pliers to bend the Rings (F) until they disconnect
from the enclosure.
For top feed wiring: (See Figure 4.)
NOTE: Before removing any closing plates from the
enclosure, consult local electrical codes.
a. To remove the closing Plate (G), unscrew bar.
Step 4: Mount the enclosure.
a. Install Mounting Flange (H) to wall. (See Figure 5.)
b. Hang panel onto mounting flange. (See Figure 5.)
c. Remove Right Compartment Deadfront (P) by
removing the two Securing Screws (Q) and lifting the
Right Compartment Deadfront (P) off the enclsoure.
(See Figure 10.)
d. Use outdoor-approved screws or nails (not provided)
in the Mounting Holes (I) to secure the enclosure to
the wall.
Step 5: Connect phase, neutral, and ground conductors.
WARNING: Use ONLY approved fittings and clamps to
avoid damage to wires.
a. Bring the Service Phase, Service Neutral, and
Ground(s) conductors into the enclosure through the
bottom feed knockout or through the the top feed
hub opening.
b. Connect the Service Phase, Service Neutral, and
Ground(s) conductors to the appropriate terminals
and tighten screws to the torque specifications in the
Terminations table.
Step 6: (Optional) Install additional main breaker.
WARNING: Leviton circuit breakers MUST BE used with
a Leviton circuit breaker enclosure.
a. Remove Left Compartment Deadfront (R).
b. Remove the hex nuts from the main breaker mounting
studs located in the left load-side compartment.
(See Figure 6.)
c. Insert the secondary main breaker into the base pan.
d. Tighten the previously removed hex nuts to the torque
specifications in the Terminations table on page 2.
e. Remove the protective covering from the
phase conductors.
f. Install the phase conductors into the terminal lugs on
the main breaker.
g. Tighten the terminal lugs to the torque specifications
in the Terminations table on page 2.
WARNINGS
Figure 1
Meter Compartment
Cover (A)
Securing
Latch (B)
Figure 2
Figure 4
Out
Figure 3
a.
b.
Hinge (D)
Hinge Pin
c.
Door (C)
Figure 5
Plate (G)
Mounting
Flange
(H)
PK-A3473-10-00-0A
Down
Meter
Compartment
Cover (A)
Knockout
(E)
Ring
(F)
Ring
(F)
Mounting
Holes
(I)
Need help?