Download Print this page

revvity Bead Ruptor 4 User Manual

Bead mill homogenizer

Advertisement

Quick Links

USER MANUAL
Bead Ruptor™ 4
Bead Mill Homogenizer
Version: S
Date: September 2024
Document Number: 03-225-01
For research use only. Not for use in diagnostic procedures

Advertisement

loading
Need help?

Need help?

Do you have a question about the Bead Ruptor 4 and is the answer not in the manual?

Questions and answers

Summary of Contents for revvity Bead Ruptor 4

  • Page 1 USER MANUAL Bead Ruptor™ 4 Bead Mill Homogenizer Version: S Date: September 2024 Document Number: 03-225-01 For research use only. Not for use in diagnostic procedures...
  • Page 2 This product is warranted to be free from defects in material and workmanship for a period of ONE YEAR from the date of delivery. Revvity will repair or replace and return free of charge any part which is returned to its factory within said period, transportation prepaid by user, and which is found upon inspection to have been defective in materials or workmanship.
  • Page 3 Copyright This manual is published by Revvity 935 Cobb Place Blvd, Kennesaw, GA 30144 USA. Copyright Revvity, Inc. All rights reserved, including but not limited to those rights to reproduce this publication or parts thereof. Reproduction of this publication or parts thereof, or the products it describes, by any means or in any form is expressly prohibited without the written permission of Revvity.
  • Page 4 Table of Contents Table of Symbols ................................... 5 Specifications ..................................6 Unpacking ....................................7 System Overview .................................. 8 General Operation ................................9 Loading 1.5 mL and 2 mL Sample Tubes .......................... 10 Loading 7 mL Sample Tubes ............................... 10 Replacing the Tube Holder (Maintenance at 12 month interval) ................11 Replacing the Neck Gasket (Maintenance at 12 month interval) ................
  • Page 5 Table of Symbols Symbol Description Symbol Description Caution. Refer to the On (power). User documentation (IEC 60417-5007) (ISO 7000-0434B) Hazardous voltage; risk Off (power). of electric shock. (IEC 60417-5008) (IEC 60417-6042) Consult Instructions for Fuse. (IEC 60417-5016) Use. (ISO 7000-1641) Alternating current.
  • Page 6 Specifications Part Number 25-010 Input Voltage 100-230V, 50/60 Hz Weight 16.5 lbs. (7.48 kg) Dimensions W: 8.5” (21.5 cm), D: 10” (25.4 cm), H: 11.5” (29.2 cm) Input Current 4A max Power Connector IEC 60320 C13 Fuse 6 x 30 mm / 4A max Overvoltage Category II Pollution Degree Altitude...
  • Page 7 Unpacking Lift foam from box. Lift unit up and off of the box bottom. DO NOT LIFT THE UNIT BY HOLDING THE LID. Remove tool kit and power cord. Remove the 2 screws from the bottom of the unit. Place the unit on a stable surface. Connect the power cord.
  • Page 8 System Overview Speed: 5 Time: 30 1. Lid 6. Speed Control 2. Keypad 7. Timer Control 3. Lid Latch 8. Run Button 4. On/Off Switch 9. Stop Button 5. Power Cord Port The Bead Ruptor 4 consists of the following: Description Quantity Bead Ruptor...
  • Page 9 General Operation 1. Power • Plug in the power cord and move the On/Off switch on back of the unit to the ON position. 2. Set Speed • Adjust speed using up and down buttons. 3. Set Timer • Adjust run time using up and down buttons. 4.
  • Page 10 Loading 1.5 mL and 2 mL Sample Tubes Loading 7 mL Sample Tubes 7 mL Tube Carriage 7 mL Tubes Revvity bead tubes should be used exclusively with Revvity Bead Ruptor Homogenizers.
  • Page 11 Replacing the Tube Holder (Maintenance at 12 month interval) Use the supplied 3 mm allen Turn unit off and unplug power Use the supplied 3 mm allen wrench to loosen tube car- cord. wrench to tighten tube carriage riage holder screw. holder screw Replacing the Neck Gasket (Maintenance at 12 month interval) Slide the new neck gasket onto...
  • Page 12 Press lid and ensure the handle is closed Detection system is faulty. WARNING: Any service must be performed by a qualified service technician. This can be either an Revvity Technician or an end user resource. All parts need to be sourced from the Revvity service department.
  • Page 13 Transporting and Storage The Bead Ruptor 4 Homogenizer must be shipped in its original packaging. Before transporting please follow this steps. Remove all tubes, cover the unit in its plastic bag. The tube carriage will slide back. Lift the tube carriage to align the motor mount holes to the holes in the base plate.
  • Page 14 Appendix This equipment is marked with the crossed-out wheeled bin symbol, to indicate that this equipment may not be disposed of as unsorted municipal waste. It’s your responsibility to correctly dispose of your equipment at life-cycle end, by handing it over to an authorized facility for separate collection and recycling of waste equipment.
  • Page 15 This page left blank intentionally.
  • Page 16 Users should exercise caution when handling materials as they may present unknown hazards. Revvity shall not be liable for any damages or losses resulting from handling or contact with the product, as Revvity cannot control actual methods, volumes, or conditions of use. Users are responsible for ensuring the product’s suitability for their specific application.

This manual is also suitable for:

25-010